If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0384152008002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.281047,"lon":-112.105633,"icon":""}]} |
| Location: 00/08-20-038-15W4/2 | |
| Location Alias: 00/08-20-38-15 W4M | |
| Location Alias 2: 00/08-20-038-15 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 038 | |
| Meridian: 4 | |
| Range: 15 | |
| Section: 20 | |
| County/Municipality: County of Paintearth No. 18 | |
| Well Name: ENTERRA PROVO 8-20-38-15 | |
| Operator Name: Canadian Coyote Energy Ltd. | |
| License Number: 0110953 | |
| License Date: 1984-11-23 | |
| License Status: Abandoned | |
| Spud Date: 1984-11-25 | |
| Final Drill Date: 1984-12-04 | |
| Well Total Depth: 1423.00 m | |
| Surface Hole Latitude: 52.281047 | |
| Surface Hole Longitude: -112.105633 |
| Date | Event |
|---|---|
| 1984-11-23 | Obtained License |
| 1984-11-26 | Surface Casing Operation Performed |
| 1984-11-29 | Drill Stem Test Performed |
| 1984-12-04 | Finished Drilling |
| 1984-12-05 | Well Log Performed |
| 1984-12-06 | Drill Stem Test Performed |
| 1984-12-07 | Plug Back Performed |
| 1984-12-07 | Production Casing Operation Performed |
| 1984-12-07 | Rig Released |
| 1985-01-31 | Perforation Treatment Performed - Jet Perforation |
| 1985-02-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1985-02-04 | Plug Back Performed |
| 1985-02-05 | Perforation Treatment Performed - Jet Perforation |
| 1985-02-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1985-02-08 | Plug Back Performed |
| 1985-02-09 | Perforation Treatment Performed - Jet Perforation |
| 1985-02-13 | Perforation Treatment Performed - Jet Perforation |
| 1985-02-17 | Well Mode changed to Drilled and Cased |
| 2003-07-21 | Perforation Treatment Performed - Fractured |
| 2003-10-15 | Well Began Production |
| 2003-10-15 | Well Fluid changed to Gas |
| 2003-10-15 | Well Mode changed to Flowing |
| 2012-04-01 | Well Fluid changed to Gas |
| 2012-04-01 | Well Mode changed to Suspended |
| 2014-09-01 | Well Fluid changed to Gas |
| 2014-09-01 | Well Mode changed to Flowing |
| 2015-03-01 | Well Fluid changed to Gas |
| 2015-03-01 | Well Mode changed to Suspended |
| 2018-07-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2018-07-29 | Plug Back Performed |
| 2018-08-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2018-08-01 | Plug Back Performed |
| 2018-08-01 | Well Fluid changed to Gas |
| 2018-08-01 | Well Log Performed |
| 2018-08-01 | Well Mode changed to Abandoned Zone |
| 2018-08-02 | Perforation Treatment Performed - Jet Perforation |
| 2018-08-02 | Perforation Treatment Performed - Remedial Casing |
| 2019-02-23 | Well Abandoned |
| 2019-02-23 | Well Fluid changed to Gas |
| 2019-02-23 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1985-01-31 | Perforation | 1175.80 | 1177.80 | 13 |
| 2018-07-29 | Packing Device Capped w/Cement | 1042.00 | 1050.00 | 0 |
| 2018-08-01 | Packing Device Capped w/Cement | 1000.00 | 1008.00 | 0 |
| 2018-08-02 | Perforation | 426.00 | 426.20 | 4 |
| 2018-08-02 | Perforation | 341.00 | 341.20 | 4 |
| 2018-08-02 | Perforation | 256.00 | 256.20 | 4 |
| 2018-08-02 | Remedial Casing Cementing | 256.00 | 426.20 | 0 |
| 1985-02-04 | Packing Device Capped w/Cement | 1165.00 | 1173.00 | 0 |
| 1985-02-05 | Perforation | 1156.50 | 1160.00 | 13 |
| 1985-02-08 | Packing Device Capped w/Cement | 1127.00 | 1135.00 | 0 |
| 1985-02-09 | Perforation | 1060.00 | 1061.00 | 13 |
| 1985-02-13 | Perforation | 1014.80 | 1015.80 | 13 |
| 1985-02-13 | Perforation | 1017.80 | 1020.80 | 13 |
| 1985-02-13 | Perforation | 1021.20 | 1024.60 | 13 |
| 2003-07-21 | Fracture | 1014.00 | 1024.60 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2003 | 239 | 0.0 | 0.0 | 0.0 |
| 2004 | 8032 | 0.0 | 0.0 | 0.0 |
| 2005 | 8049 | 0.0 | 0.0 | 0.0 |
| 2006 | 8759 | 0.0 | 0.0 | 0.0 |
| 2007 | 8759 | 0.0 | 0.0 | 0.0 |
| 2008 | 7485 | 0.0 | 0.0 | 0.0 |
| 2009 | 8150 | 0.0 | 0.0 | 0.0 |
| 2010 | 8495 | 0.0 | 0.0 | 0.0 |
| 2011 | 1440 | 0.0 | 0.0 | 0.0 |
| 2014 | 2776 | 0.0 | 0.0 | 0.0 |
| 2015 | 1395 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2018-07-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]