If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384161915000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.287081,"lon":-112.278224,"icon":""}]} |
Location: 00/15-19-038-16W4/0 | |
Location Alias: 00/15-19-38-16 W4M | |
Location Alias 2: 00/15-19-038-16 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 16 | |
Section: 19 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: COGI HALKIRK 15-19-38-16 | |
Operator Name: Canadian Oil & Gas International Inc. | |
License Number: 0132800 | |
License Date: 1988-03-03 | |
License Status: Abandoned | |
Spud Date: 1988-03-05 | |
Final Drill Date: 1988-03-10 | |
Well Total Depth: 1258.00 m | |
Surface Hole Latitude: 52.287081 | |
Surface Hole Longitude: -112.278224 |
Date | Event |
---|---|
1988-03-03 | Obtained License |
1988-03-06 | Surface Casing Operation Performed |
1988-03-10 | Finished Drilling |
1988-03-10 | Well Mode changed to Drilled and Cased |
1988-03-11 | Well Log Performed |
1988-03-12 | Production Casing Operation Performed |
1988-03-12 | Rig Released |
1988-06-15 | Perforation Treatment Performed - Jet Perforation |
1988-06-15 | Well Log Performed |
1988-06-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-06-20 | Well Log Performed |
1988-06-21 | Perforation Treatment Performed - Cement Squeeze |
1988-06-23 | Perforation Treatment Performed - Jet Perforation |
1988-06-23 | Well Log Performed |
1988-07-11 | Well Began Production |
1988-07-11 | Well Fluid changed to Crude Oil |
1988-07-11 | Well Mode changed to Pumping |
1993-10-01 | Well Fluid changed to Crude Oil |
1993-10-01 | Well Mode changed to Suspended |
1995-07-24 | Well Log Performed |
1995-07-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-07-25 | Perforation Treatment Performed - Jet Perforation |
1995-07-25 | Plug Back Performed |
1995-07-26 | Perforation Treatment Performed - Remedial Casing |
1995-07-26 | Well Fluid changed to Crude Oil |
1995-07-26 | Well Mode changed to Abandoned |
1995-07-28 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-06-15 | Perforation | 1208.20 | 1208.70 | 13 |
1988-06-17 | Acid Treatment | 1208.20 | 1208.70 | 0 |
1988-06-21 | Cement Squeeze | 1208.20 | 1208.70 | 0 |
1988-06-23 | Perforation | 1208.20 | 1210.00 | 13 |
1995-07-25 | Packing Device Capped w/Cement | 1197.00 | 1205.00 | 0 |
1995-07-25 | Perforation | 245.00 | 245.20 | 13 |
1995-07-26 | Remedial Casing Cementing | 245.00 | 245.20 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 2443 | 0.0 | 0.0 | 0.0 |
1989 | 3791 | 0.0 | 0.0 | 0.0 |
1990 | 1609 | 0.0 | 0.0 | 0.0 |
1991 | 1507 | 0.0 | 0.0 | 0.0 |
For data sources see[5]