X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384173006000

Well Details

Well ID: 0384173006000
Loading map...
Location: 00/06-30-038-17W4/0
Location Alias: 00/06-30-38-17 W4M
Location Alias 2: 00/06-30-038-17 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 17
Section: 30
County/Municipality: County of Stettler No. 6
Well Name: ORBIT ET AL GADSBY 6-30-38-17
Operator Name: Sunoma Energy Corp.
License Number: 0074036
License Date: 1979-01-19
License Status: RecCertified
Spud Date: 1979-06-13
Final Drill Date: 1979-06-22
Well Total Depth: 1285.00 m
Surface Hole Latitude: 52.292278
Surface Hole Longitude: -112.427348

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-01-19 Obtained License
1979-06-17 Drill Stem Test Performed
1979-06-20 Drill Stem Test Performed
1979-06-21 Drill Stem Test Performed
1979-06-22 Finished Drilling
1979-06-22 Well Log Performed
1979-06-22 Well Mode changed to Drilled and Cased
1979-06-23 Drill Stem Test Performed
1979-06-24 Production Casing Operation Performed
1979-07-07 Perforation Treatment Performed - Jet Perforation
1979-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-07-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-07-10 Perforation Treatment Performed - Jet Perforation
1979-07-12 Perforation Treatment Performed - Fractured
1979-11-01 Well Began Production
1979-11-01 Well Fluid changed to Crude Oil
1979-11-01 Well Mode changed to Pumping
1979-11-26 Well Fluid changed to Crude Oil
1979-11-26 Well Mode changed to Suspended
1986-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-11-06 Plug Back Performed
1986-11-06 Well Fluid changed to Crude Oil
1986-11-06 Well Mode changed to Abandoned
1986-11-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-07-07 Perforation 1258.00 1259.00 13
1979-07-07 Perforation 1260.00 1261.00 13
1979-07-08 Acid Treatment 1258.00 1261.00 0
1979-07-09 Packing Device Capped w/Cement 1254.00 1254.00 13
1979-07-10 Perforation 1245.50 1246.30 13
1979-07-10 Perforation 1247.00 1249.30 13
1979-07-12 Fracture 1245.50 1249.30 0
1986-11-06 Packing Device Capped w/Cement 1232.00 1240.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 600 0.0 0.0 0.0

For data sources see[5]

References