X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384200311002

Well Details

Well ID: 0384200311002
Loading map...
Location: 00/11-03-038-20W4/2
Location Alias: 00/11-03-38-20 W4M
Location Alias 2: 00/11-03-038-20 W4/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 20
Section: 03
County/Municipality: County of Stettler No. 6
Well Name: BEARSPAW UNIT STETTLER 11-3-38-20
Operator Name: Bearspaw Petroleum Ltd.
License Number: 0007679
License Date: 1954-02-12
License Status: Issued
Spud Date: 1954-02-25
Final Drill Date: 1954-03-15
Well Total Depth: 1604.50 m
Surface Hole Latitude: 52.239420
Surface Hole Longitude: -112.781938

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-02-12 Obtained License
1954-03-12 Production Casing Operation Performed
1954-03-15 Finished Drilling
1954-03-15 Perforation Treatment Performed - Open-Hole Completion
1954-03-15 Well Mode changed to Drilled and Cased
1963-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-08-19 Perforation Treatment Performed - Cement Plug
1981-08-19 Perforation Treatment Performed - Open-Hole Completion
1981-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-04-12 Liner Casing Operation Performed
2010-05-10 Perforation Treatment Performed - Cement Squeeze
2010-05-10 Plug Back Performed
2010-05-12 Perforation Treatment Performed - Jet Perforation
2010-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-09-01 Well Began Production
2018-09-01 Well Fluid changed to Gas
2018-09-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-03-15 Open Hole/Barefoot Completion 1587.70 1604.50 0
2010-05-12 Perforation 1401.00 1403.00 20
2010-05-18 Acid Treatment 1401.00 1409.00 0
1963-03-20 Acid Treatment 1587.70 1604.50 0
1964-03-25 Acid Treatment 1587.70 1604.50 0
1981-08-19 Cement Plug 1592.40 1604.50 0
1981-08-19 Open Hole/Barefoot Completion 1587.70 1592.40 0
1981-08-20 Acid Treatment 1587.70 1592.40 0
1983-10-04 Acid Treatment 1587.70 1592.40 0
2010-05-10 Cement Squeeze 1587.70 1592.40 0
2010-05-12 Perforation 1406.50 1409.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 28 0.0 0.0 0.0
2019 3789 0.0 0.0 0.0
2020 844 0.0 0.0 0.0

For data sources see[5]

References