X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384200409003

Well Details

Well ID: 0384200409003
Loading map...
Location: 00/09-04-038-20W4/3
Location Alias: 00/09-04-38-20 W4M
Location Alias 2: 00/09-04-038-20 W4/03
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 20
Section: 04
County/Municipality: County of Stettler No. 6
Well Name: BEARSPAW STETTLER 9-4-38-20
Operator Name: Bearspaw Petroleum Ltd.
License Number: 0001739
License Date: 1950-07-13
License Status: Issued
Spud Date: 1950-07-22
Final Drill Date: 1950-08-22
Well Total Depth: 1655.10 m
Surface Hole Latitude: 52.239440
Surface Hole Longitude: -112.794019

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-07-13 Obtained License
1950-08-15 Drill Stem Test Performed
1950-08-17 Drill Stem Test Performed
1950-08-18 Drill Stem Test Performed
1950-08-22 Finished Drilling
1950-08-22 Perforation Treatment Performed - Open-Hole Completion
1950-08-22 Well Mode changed to Drilled and Cased
1964-11-18 Perforation Treatment Performed - Open-Hole Completion
1966-01-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-11-08 Well Log Performed
1980-05-15 Liner Casing Operation Performed
1980-05-15 Perforation Treatment Performed - Cement Squeeze
1980-05-22 Perforation Treatment Performed - Jet Perforation
1980-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-06-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-06-12 Perforation Treatment Performed - Jet Perforation
2002-06-12 Plug Back Performed
2002-06-12 Well Log Performed
2002-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-06-14 Perforation Treatment Performed - Jet Perforation
2002-06-14 Well Log Performed
2002-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-06-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-06-19 Plug Back Performed
2002-06-19 Well Log Performed
2002-06-21 Perforation Treatment Performed - Jet Perforation
2002-06-21 Well Log Performed
2002-06-25 Perforation Treatment Performed - Fractured
2002-07-22 Well Began Production
2002-07-22 Well Fluid changed to Gas
2002-07-22 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-08-22 Open Hole/Barefoot Completion 1637.70 1645.00 0
2002-06-14 Perforation 1586.00 1589.80 13
2002-06-14 Perforation 1585.00 1586.00 13
2002-06-17 Acid Treatment 1585.00 1589.80 0
2002-06-19 Packing Device Capped w/Cement 1572.00 1580.00 0
2002-06-21 Perforation 1260.00 1264.30 14
2002-06-25 Fracture 1260.00 1264.30 0
1964-11-18 Open Hole/Barefoot Completion 1637.70 1655.10 0
1966-01-04 Acid Treatment 1637.70 1655.10 0
1980-05-15 Cement Squeeze 1637.70 1655.10 0
1980-05-22 Perforation 1636.00 1637.50 13
1980-05-23 Acid Treatment 1636.00 1637.50 0
2002-06-12 Packing Device Capped w/Cement 1619.30 1627.30 0
2002-06-12 Perforation 1601.40 1605.10 13
2002-06-13 Acid Treatment 1601.40 1605.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 1595 0.0 0.0 0.0
2003 8609 0.0 0.0 0.0
2004 8448 0.0 0.0 0.0
2005 8544 0.0 0.0 0.0
2006 8156 0.0 0.0 0.0
2007 6974 0.0 0.0 0.0
2008 8458 0.0 0.0 0.0
2009 7584 0.0 0.0 0.0
2010 8547 0.0 0.0 0.0
2011 7827 0.0 0.0 0.0
2012 8526 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8711 0.0 0.0 0.0
2015 8679 0.0 0.0 0.0
2016 7583 0.0 0.0 0.0
2017 5964 0.0 0.0 0.0
2018 3205 0.0 0.0 0.0
2019 4357 0.0 0.0 0.0
2020 1225 0.0 0.0 0.0

For data sources see[5]

References