X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384201012000

Well Details

Well ID: 0384201012000
Loading map...
Location: 00/12-10-038-20W4/0
Location Alias: 00/12-10-38-20 W4M
Location Alias 2: 00/12-10-038-20 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 20
Section: 10
County/Municipality: County of Stettler No. 6
Well Name: BEARSPAW UNIT STETTLER 12-10-38-20
Operator Name: Bearspaw Petroleum Ltd.
License Number: 0007812
License Date: 1954-03-12
License Status: Issued
Spud Date: 1954-03-22
Final Drill Date: 1954-04-07
Well Total Depth: 1633.40 m
Surface Hole Latitude: 52.253935
Surface Hole Longitude: -112.787775

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-03-12 Obtained License
1954-04-04 Production Casing Operation Performed
1954-04-07 Finished Drilling
1954-04-07 Perforation Treatment Performed - Open-Hole Completion
1954-04-07 Well Mode changed to Drilled and Cased
1954-04-09 Well Began Production
1954-04-09 Well Fluid changed to Crude Oil
1954-04-09 Well Mode changed to Flowing
1961-11-17 Perforation Treatment Performed - Jet Perforation
1961-11-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-11-23 Well Fluid changed to Crude Oil
1961-11-23 Well Mode changed to Flowing
1972-10-28 Well Fluid changed to Crude Oil
1972-10-28 Well Mode changed to Pumping
1978-04-27 Well Log Performed
1978-04-29 Perforation Treatment Performed - Cement Plug
1978-04-29 Perforation Treatment Performed - Open-Hole Completion
1985-02-01 Well Fluid changed to Crude Oil
1985-02-01 Well Mode changed to Suspended
1999-07-26 Well Fluid changed to Crude Oil
1999-07-26 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-04-07 Open Hole/Barefoot Completion 1626.40 1633.40 0
1961-11-17 Perforation 1569.70 1572.80 13
1961-11-20 Acid Treatment 1569.70 1572.80 0
1978-04-29 Cement Plug 1630.20 1633.10 0
1978-04-29 Open Hole/Barefoot Completion 1626.40 1630.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3134 0.0 0.0 0.0
1968 2610 0.0 0.0 0.0
1969 2417 0.0 0.0 0.0
1970 2655 0.0 0.0 0.0
1971 4099 0.0 0.0 0.0
1972 5238 0.0 0.0 0.0
1973 8399 0.0 0.0 0.0
1974 8499 0.0 0.0 0.0
1975 8025 0.0 0.0 0.0
1976 8312 0.0 0.0 0.0
1977 8308 0.0 0.0 0.0
1978 8172 0.0 0.0 0.0
1979 8403 0.0 0.0 0.0
1980 7487 0.0 0.0 0.0
1981 8098 0.0 0.0 0.0
1982 8005 0.0 0.0 0.0
1983 576 0.0 0.0 0.0
1999 2970 0.0 0.0 0.0
2000 7387 0.0 0.0 0.0
2001 7370 0.0 0.0 0.0
2002 7558 0.0 0.0 0.0
2003 7815 0.0 0.0 0.0
2004 7526 0.0 0.0 0.0
2005 7966 0.0 0.0 0.0
2006 6944 0.0 0.0 0.0
2008 1248 0.0 0.0 0.0
2009 7950 0.0 0.0 0.0
2010 8211 0.0 0.0 0.0
2011 7792 0.0 0.0 0.0
2012 6610 0.0 0.0 0.0
2013 7592 0.0 0.0 0.0
2014 8292 0.0 0.0 0.0
2015 7558 0.0 0.0 0.0
2016 8340 0.0 0.0 0.0
2017 8239 0.0 0.0 0.0
2018 7850 0.0 0.0 0.0
2019 8728 0.0 0.0 0.0
2020 2181 0.0 0.0 0.0

For data sources see[5]

References