If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384201013000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.257552,"lon":-112.78776,"icon":""}]} |
Location: 00/13-10-038-20W4/0 | |
Location Alias: 00/13-10-38-20 W4M | |
Location Alias 2: 00/13-10-038-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 20 | |
Section: 10 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: BEARSPAW UNIT STETTLER 13-10-38-20 | |
Operator Name: Bearspaw Petroleum Ltd. | |
License Number: 0002157 | |
License Date: 1950-10-16 | |
License Status: Issued | |
Spud Date: 1951-08-16 | |
Final Drill Date: 1951-09-17 | |
Well Total Depth: 1630.10 m | |
Surface Hole Latitude: 52.257552 | |
Surface Hole Longitude: -112.787760 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1950-10-16 | Obtained License |
1951-09-12 | Production Casing Operation Performed |
1951-09-17 | Finished Drilling |
1951-09-17 | Perforation Treatment Performed - Open-Hole Completion |
1951-09-17 | Well Mode changed to Drilled and Cased |
1951-09-30 | Well Began Production |
1951-09-30 | Well Fluid changed to Crude Oil |
1951-09-30 | Well Mode changed to Flowing |
1952-12-01 | Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug |
1954-10-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1954-10-29 | Well Fluid changed to Crude Oil |
1954-10-29 | Well Mode changed to Abandoned Zone |
1954-10-30 | Perforation Treatment Performed - Jet Perforation |
1954-11-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-07-06 | Perforation Treatment Performed - Cement Squeeze |
1965-07-09 | Perforation Treatment Performed - Jet Perforation |
1965-07-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-10-09 | Perforation Treatment Performed - Cement Plug |
1982-06-19 | Perforation Treatment Performed - Cement Squeeze |
1982-06-24 | Perforation Treatment Performed - Open-Hole Completion |
1982-06-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-07-01 | Well Fluid changed to Crude Oil |
1982-07-01 | Well Mode changed to Pumping |
1982-08-06 | Perforation Treatment Performed - Cement Plug |
1982-08-06 | Perforation Treatment Performed - Open-Hole Completion |
1982-10-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1982-10-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-10-30 | Perforation Treatment Performed - Jet Perforation |
1982-10-30 | Well Fluid changed to Crude Oil |
1982-10-30 | Well Mode changed to Abandoned Zone |
1983-10-19 | Well Log Performed |
1983-10-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-10-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1983-10-21 | Perforation Treatment Performed - Jet Perforation |
1983-10-21 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1951-09-17 | Open Hole/Barefoot Completion | 1620.90 | 1630.10 | 0 |
1965-07-10 | Acid Treatment | 1580.40 | 1588.60 | 0 |
1980-10-09 | Cement Plug | 1588.60 | 1591.50 | 0 |
1982-06-19 | Cement Squeeze | 1580.40 | 1588.60 | 0 |
1982-06-24 | Open Hole/Barefoot Completion | 1620.90 | 1626.30 | 0 |
1982-06-25 | Acid Treatment | 1620.90 | 1626.30 | 0 |
1982-08-06 | Cement Plug | 1624.60 | 1630.10 | 0 |
1982-08-06 | Open Hole/Barefoot Completion | 1620.90 | 1624.60 | 0 |
1982-10-29 | Packing Device Capped w/Cement | 1601.00 | 1615.00 | 0 |
1982-10-30 | Perforation | 1585.00 | 1587.00 | 13 |
1982-10-30 | Acid Treatment | 1585.00 | 1587.00 | 0 |
1952-12-01 | Resin-Gypsum Squeeze or Plug | 1627.00 | 1630.10 | 0 |
1983-10-21 | Packing Device Capped w/Cement | 1568.00 | 1568.00 | 0 |
1983-10-21 | Perforation | 1564.00 | 1566.50 | 13 |
1983-10-21 | Acid Treatment | 1564.00 | 1566.50 | 0 |
1954-10-29 | Packing Device Capped w/Cement | 1594.40 | 1599.00 | 0 |
1954-10-30 | Perforation | 1565.10 | 1568.50 | 13 |
1954-10-30 | Perforation | 1571.20 | 1575.20 | 13 |
1954-11-11 | Acid Treatment | 1565.10 | 1575.20 | 0 |
1965-07-06 | Cement Squeeze | 1565.10 | 1575.20 | 0 |
1965-07-09 | Perforation | 1580.40 | 1582.50 | 7 |
1965-07-09 | Perforation | 1585.00 | 1588.60 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]