X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384201512000

Well Details

Well ID: 0384201512000
Loading map...
Location: 00/12-15-038-20W4/0
Location Alias: 00/12-15-38-20 W4M
Location Alias 2: 00/12-15-038-20 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 20
Section: 15
County/Municipality: County of Stettler No. 6
Well Name: BEARSPAW STETTLER 12-15-38-20
Operator Name: Bearspaw Petroleum Ltd.
License Number: 0004226
License Date: 1952-02-14
License Status: Suspension
Spud Date: 1952-02-22
Final Drill Date: 1952-03-20
Well Total Depth: 1622.10 m
Surface Hole Latitude: 52.268601
Surface Hole Longitude: -112.787727

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-02-14 Obtained License
1952-03-18 Production Casing Operation Performed
1952-03-20 Finished Drilling
1952-03-20 Perforation Treatment Performed - Open-Hole Completion
1952-03-20 Well Mode changed to Drilled and Cased
1952-03-30 Well Began Production
1952-03-30 Well Fluid changed to Crude Oil
1952-03-30 Well Mode changed to Flowing
1961-11-01 Perforation Treatment Performed - Jet Perforation
1961-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-11-06 Perforation Treatment Performed - Acid Wash - No Pressure
1961-11-08 Well Fluid changed to Crude Oil
1961-11-08 Well Mode changed to Flowing
1973-12-07 Well Fluid changed to Crude Oil
1973-12-07 Well Mode changed to Pumping
1978-03-01 Well Fluid changed to Crude Oil
1978-03-01 Well Mode changed to Suspended
1978-08-16 Well Log Performed
1980-04-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-04-10 Well Fluid changed to Crude Oil
1980-04-10 Well Mode changed to Abandoned Zone
1980-04-12 Perforation Treatment Performed - Cement Squeeze
1980-04-16 Perforation Treatment Performed - Jet Perforation
1992-07-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-07-12 Perforation Treatment Performed - Jet Perforation
1992-07-12 Plug Back Performed
1992-07-12 Well Log Performed
1992-07-13 Perforation Treatment Performed - Remedial Casing
1993-07-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-03-20 Open Hole/Barefoot Completion 1613.00 1622.10 0
1992-07-13 Remedial Casing Cementing 170.00 170.50 0
1961-11-01 Perforation 1563.60 1566.10 13
1961-11-06 Acid Wash 1563.60 1566.10 0
1961-11-06 Acid Treatment 1563.60 1566.10 0
1980-04-10 Packing Device Capped w/Cement 1583.00 1588.00 0
1980-04-12 Cement Squeeze 1563.60 1566.10 0
1980-04-16 Perforation 1571.50 1574.00 13
1992-07-12 Packing Device Capped w/Cement 1552.00 1560.00 0
1992-07-12 Perforation 170.00 170.50 8

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3075 0.0 0.0 0.0
1968 2693 0.0 0.0 0.0
1969 2978 0.0 0.0 0.0
1970 3040 0.0 0.0 0.0
1971 3592 0.0 0.0 0.0
1972 6524 0.0 0.0 0.0
1973 8388 0.0 0.0 0.0
1974 6641 0.0 0.0 0.0
1975 7613 0.0 0.0 0.0
1976 7777 0.0 0.0 0.0
1977 732 0.0 0.0 0.0
1978 744 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2003-08-30 No Incident Encountered 0.00 0.00

For data sources see[6]

References