X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384201601002

Well Details

Well ID: 0384201601002
Loading map...
Location: 00/01-16-038-20W4/2
Location Alias: 00/01-16-38-20 W4M
Location Alias 2: 00/01-16-038-20 W4/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 20
Section: 16
County/Municipality: County of Stettler No. 6
Well Name: BEARSPAW UNIT STETTLER 2-16-38-20
Operator Name: Bearspaw Petroleum Ltd.
License Number: 0003927
License Date: 1951-12-11
License Status: Issued
Spud Date: 1952-01-28
Final Drill Date: 1952-03-05
Well Total Depth: 1621.50 m
Surface Hole Latitude: 52.261362
Surface Hole Longitude: -112.793937

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-12-11 Obtained License
1952-03-05 Finished Drilling
1952-03-05 Well Mode changed to Drilled and Cased
1952-03-06 Production Casing Operation Performed
1952-03-08 Perforation Treatment Performed - Open-Hole Completion
1954-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1954-11-16 Perforation Treatment Performed - Jet Perforation
1954-11-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-11-20 Well Began Production
1954-11-20 Well Fluid changed to Crude Oil
1954-11-20 Well Mode changed to Pumping
1984-06-15 Perforation Treatment Performed - Cement Squeeze
1984-06-20 Well Log Performed
1984-06-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-06-21 Perforation Treatment Performed - Jet Perforation
1984-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-10-05 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-03-08 Open Hole/Barefoot Completion 1620.00 1621.50 0
1984-10-05 Acid Treatment 1567.00 1571.50 0
1954-11-16 Packing Device Capped w/Cement 1594.10 1598.10 0
1954-11-16 Perforation 1567.00 1578.90 13
1954-11-20 Acid Treatment 1567.00 1578.90 0
1984-06-15 Cement Squeeze 1567.00 1578.90 0
1984-06-21 Perforation 1581.60 1583.10 13
1984-06-21 Acid Treatment 1581.60 1583.10 0
1984-10-04 Packing Device Capped w/Cement 1579.50 1579.50 0
1984-10-05 Perforation 1567.00 1571.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6241 0.0 0.0 0.0
1968 3963 0.0 0.0 0.0
1970 200 0.0 0.0 0.0
1979 408 0.0 0.0 0.0
1984 1612 0.0 0.0 0.0
1985 8167 0.0 0.0 0.0
1986 8440 0.0 0.0 0.0
1987 8323 0.0 0.0 0.0
1988 8631 0.0 0.0 0.0
1989 8146 0.0 0.0 0.0
1990 8633 0.0 0.0 0.0
1991 8223 0.0 0.0 0.0
1992 8607 0.0 0.0 0.0
1993 8635 0.0 0.0 0.0
1994 8561 0.0 0.0 0.0
1995 7502 0.0 0.0 0.0
1996 3288 0.0 0.0 0.0
1997 7774 0.0 0.0 0.0
1998 7455 0.0 0.0 0.0
2002 7538 0.0 0.0 0.0
2003 8322 0.0 0.0 0.0
2004 2400 0.0 0.0 0.0
2005 6986 0.0 0.0 0.0
2006 2464 0.0 0.0 0.0
2008 2981 0.0 0.0 0.0
2009 8383 0.0 0.0 0.0
2010 7641 0.0 0.0 0.0
2011 8131 0.0 0.0 0.0
2012 7598 0.0 0.0 0.0
2013 8037 0.0 0.0 0.0
2014 7522 0.0 0.0 0.0
2015 8663 0.0 0.0 0.0
2016 7481 0.0 0.0 0.0
2017 8136 0.0 0.0 0.0
2018 8432 0.0 0.0 0.0
2019 8599 0.0 0.0 0.0
2020 2179 0.0 0.0 0.0

For data sources see[5]

References