X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384201615000

Well Details

Well ID: 0384201615000
Loading map...
Location: 00/15-16-038-20W4/0
Location Alias: 00/15-16-38-20 W4M
Location Alias 2: 00/15-16-038-20 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 20
Section: 16
County/Municipality: County of Stettler No. 6
Well Name: BEARSPAW ET AL STETTLER 15-16
Operator Name: Bearspaw Petroleum Ltd.
License Number: 0083849
License Date: 1980-06-27
License Status: Issued
Spud Date: 1980-07-04
Final Drill Date: 1980-07-28
Well Total Depth: 1635.00 m
Surface Hole Latitude: 52.271666
Surface Hole Longitude: -112.798809

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-06-27 Obtained License
1980-07-28 Finished Drilling
1980-07-28 Well Log Performed
1980-07-28 Well Mode changed to Drilled and Cased
1980-07-29 Drill Stem Test Performed
1980-07-30 Drill Stem Test Performed
1980-08-01 Production Casing Operation Performed
1980-10-16 Perforation Treatment Performed - Jet Perforation
1980-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-18 Perforation Treatment Performed - Jet Perforation
1980-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-23 Perforation Treatment Performed - Jet Perforation
1980-10-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-12-01 Well Began Production
1980-12-01 Well Fluid changed to Crude Oil
1980-12-01 Well Mode changed to Pumping
1981-01-28 Perforation Treatment Performed - Cement Squeeze
1981-01-28 Well Fluid changed to Crude Oil
1981-01-28 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-10-16 Perforation 1616.50 1618.00 13
1980-10-17 Acid Treatment 1616.50 1618.00 0
1980-10-18 Perforation 1586.00 1588.00 13
1980-10-21 Acid Treatment 1586.00 1588.00 0
1980-10-23 Perforation 1579.00 1582.00 13
1980-10-24 Acid Treatment 1579.00 1582.00 0
1980-10-30 Acid Treatment 1579.00 1582.00 0
1981-01-28 Cement Squeeze 1579.00 1588.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 744 0.0 0.0 0.0
1981 8111 0.0 0.0 0.0
1982 8192 0.0 0.0 0.0
1983 8444 0.0 0.0 0.0
1984 8459 0.0 0.0 0.0
1985 8410 0.0 0.0 0.0
1986 8604 0.0 0.0 0.0
1987 8277 0.0 0.0 0.0
1988 8685 0.0 0.0 0.0
1989 8313 0.0 0.0 0.0
1990 8607 0.0 0.0 0.0
1991 7284 0.0 0.0 0.0
1992 8474 0.0 0.0 0.0
1993 8420 0.0 0.0 0.0
1994 8501 0.0 0.0 0.0
1995 8472 0.0 0.0 0.0
1996 8486 0.0 0.0 0.0
1997 7411 0.0 0.0 0.0
1998 8102 0.0 0.0 0.0
1999 7372 0.0 0.0 0.0
2000 8633 0.0 0.0 0.0
2001 8440 0.0 0.0 0.0
2002 8132 0.0 0.0 0.0
2003 8520 0.0 0.0 0.0
2004 8600 0.0 0.0 0.0
2005 8333 0.0 0.0 0.0
2006 8510 0.0 0.0 0.0
2007 8598 0.0 0.0 0.0
2008 8336 0.0 0.0 0.0
2009 8207 0.0 0.0 0.0
2010 8468 0.0 0.0 0.0
2011 8607 0.0 0.0 0.0
2012 5967 0.0 0.0 0.0
2013 8758 0.0 0.0 0.0
2014 7713 0.0 0.0 0.0
2015 5939 0.0 0.0 0.0
2016 8331 0.0 0.0 0.0
2017 8308 0.0 0.0 0.0
2018 7970 0.0 0.0 0.0
2019 8651 0.0 0.0 0.0
2020 2131 0.0 0.0 0.0

For data sources see[5]

References