X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384202016000

Well Details

Well ID: 0384202016000
Loading map...
Location: 00/16-20-038-20W4/0
Location Alias: 00/16-20-38-20 W4M
Location Alias 2: 00/16-20-038-20 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 20
Section: 20
County/Municipality: County of Stettler No. 6
Well Name: BEARSPAW STETTLER 16-20-38-20
Operator Name: Bearspaw Petroleum Ltd.
License Number: 0009447
License Date: 1955-05-06
License Status: Issued
Spud Date: 1955-05-19
Final Drill Date: 1955-06-09
Well Total Depth: 1620.60 m
Surface Hole Latitude: 52.286329
Surface Hole Longitude: -112.817020

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-05-06 Obtained License
1955-06-07 Production Casing Operation Performed
1955-06-09 Finished Drilling
1955-06-09 Well Mode changed to Drilled and Cased
1955-06-22 Well Began Production
1955-06-22 Well Fluid changed to Crude Oil
1955-06-22 Well Mode changed to Flowing
1956-06-08 Perforation Treatment Performed - Open-Hole Completion
1961-06-04 Drill Stem Test Performed
1974-06-24 Well Fluid changed to Crude Oil
1974-06-24 Well Mode changed to Pumping
1975-08-01 Well Fluid changed to Crude Oil
1975-08-01 Well Mode changed to Suspended
1977-11-18 Perforation Treatment Performed - Cement Plug
1977-11-18 Perforation Treatment Performed - Open-Hole Completion
1977-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-01-01 Well Fluid changed to Crude Oil
1978-01-01 Well Mode changed to Pumping
1982-06-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-06-05 Well Fluid changed to Crude Oil
1982-06-05 Well Mode changed to Abandoned Zone
1982-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-08 Perforation Treatment Performed - Jet Perforation
1987-08-27 Perforation Treatment Performed - Open-Hole Completion
1987-09-01 Well Fluid changed to Crude Oil
1987-09-01 Well Mode changed to Pumping
1987-11-30 Well Fluid changed to Crude Oil
1987-11-30 Well Mode changed to Suspended
1991-12-03 Well Fluid changed to Crude Oil
1991-12-03 Well Mode changed to Pumping
1992-02-28 Well Fluid changed to Crude Oil
1992-02-28 Well Mode changed to Suspended
2003-03-29 Perforation Treatment Performed - Cement Squeeze
2003-03-29 Plug Back Performed
2003-04-16 Perforation Treatment Performed - Jet Perforation
2003-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-04-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-04-23 Perforation Treatment Performed - Bridge Plug No Cement Required
2003-04-23 Perforation Treatment Performed - Jet Perforation
2003-04-23 Plug Back Performed
2003-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-06-08 Open Hole/Barefoot Completion 1613.90 1620.60 0
2003-03-29 Cement Squeeze 1613.90 1617.40 0
2003-03-29 Cement Squeeze 1574.90 1581.30 0
2003-04-16 Perforation 1613.80 1615.30 13
2003-04-17 Acid Treatment 1613.80 1615.30 0
2003-04-23 Packing Device Capped w/Cement 1605.70 1613.70 0
2003-04-23 Bridge Plug, No Cement 1581.70 1582.50 0
2003-04-23 Perforation 1574.60 1576.40 13
2003-04-23 Perforation 1567.90 1571.50 13
2003-04-23 Perforation 1562.70 1565.50 13
2003-04-24 Acid Treatment 1562.70 1576.40 0
1977-11-18 Cement Plug 1616.40 1620.60 0
1977-11-18 Open Hole/Barefoot Completion 1613.90 1616.40 0
1977-11-19 Acid Treatment 1613.90 1616.40 0
1982-06-05 Packing Device Capped w/Cement 1590.00 1600.00 0
1982-06-08 Perforation 1574.90 1577.00 13
1982-06-08 Perforation 1579.40 1581.30 13
1982-06-08 Acid Treatment 1574.90 1581.30 0
1987-08-27 Open Hole/Barefoot Completion 1613.90 1617.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1974 3944 0.0 0.0 0.0
1975 4818 0.0 0.0 0.0
1978 8422 0.0 0.0 0.0
1979 8408 0.0 0.0 0.0
1980 4989 0.0 0.0 0.0
1987 838 0.0 0.0 0.0
1991 696 0.0 0.0 0.0
1992 870 0.0 0.0 0.0

For data sources see[5]

References