X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384202113000

Well Details

Well ID: 0384202113000
Loading map...
Location: 00/13-21-038-20W4/0
Location Alias: 00/13-21-38-20 W4M
Location Alias 2: 00/13-21-038-20 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 20
Section: 21
County/Municipality: County of Stettler No. 6
Well Name: BEARSPAW UNIT STETTLER 13-21-38-20
Operator Name: Bearspaw Petroleum Ltd.
License Number: 0012901
License Date: 1957-01-09
License Status: Abandoned
Spud Date: 1957-02-03
Final Drill Date: 1957-03-07
Well Total Depth: 1606.30 m
Surface Hole Latitude: 52.286758
Surface Hole Longitude: -112.811456

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-01-09 Obtained License
1957-02-10 Lost Circulation Occurred
1957-02-23 Drill Stem Test Performed
1957-02-26 Drill Stem Test Performed
1957-02-27 Drill Stem Test Performed
1957-02-28 Drill Stem Test Performed
1957-03-07 Drill Stem Test Performed
1957-03-07 Finished Drilling
1957-03-07 Well Mode changed to Drilled and Cased
1957-03-09 Production Casing Operation Performed
1957-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-03-11 Perforation Treatment Performed - Bullet Perforation
1957-04-01 Well Began Production
1957-04-01 Well Fluid changed to Crude Oil
1957-04-01 Well Mode changed to Pumping
1958-05-22 Perforation Treatment Performed - Bullet Perforation
1958-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-10-31 Perforation Treatment Performed - Cement Squeeze
1964-07-29 Perforation Treatment Performed - Selective Bullet Perforations
1964-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-10-28 Well Fluid changed to Crude Oil
1968-10-28 Well Mode changed to Suspended
2006-01-02 Well Fluid changed to Crude Oil
2006-01-02 Well Mode changed to Abandoned Zone
2006-02-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-01 Plug Back Performed
2006-02-06 Perforation Treatment Performed - Jet Perforation
2006-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-07 Perforation Treatment Performed - Cement Plug
2006-02-07 Perforation Treatment Performed - Remedial Casing
2006-02-07 Plug Back Performed
2006-09-21 Well Abandoned
2006-09-21 Well Fluid changed to Crude Oil
2006-09-21 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-03-11 Bullet Perforation 1584.70 1588.00 13
2006-02-01 Packing Device Capped w/Cement 1347.00 1440.00 0
2006-02-06 Perforation 230.00 230.50 13
2006-02-06 Perforation 90.00 90.50 13
2006-02-07 Cement Plug 700.00 950.00 0
2006-02-07 Cement Plug 480.00 680.00 0
2006-02-07 Cement Plug 250.00 450.00 0
2006-02-07 Remedial Casing Cementing 230.00 230.50 0
2006-02-07 Packing Device Capped w/Cement 100.00 225.00 0
2006-02-07 Remedial Casing Cementing 90.00 90.50 0
2006-02-07 Packing Device Capped w/Cement 10.00 80.00 0
1957-03-11 Acid Treatment 1584.70 1588.00 0
1958-05-22 Bullet Perforation 1575.20 1579.20 13
1958-05-23 Acid Treatment 1575.20 1579.20 0
1962-10-31 Cement Squeeze 1581.90 1588.00 0
1964-07-29 Selective Bullet Perforations 1564.20 1566.40 3
1964-07-29 Selective Bullet Perforations 1567.00 1567.60 3
1964-07-29 Selective Bullet Perforations 1570.00 1570.60 3
1964-07-30 Acid Treatment 1564.20 1570.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1957-02-10 Lost Circulation 1274.10 1274.10

For data sources see[6]

References