If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0384202704002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.290566,"lon":-112.787614,"icon":""}]} |
| Location: 00/04-27-038-20W4/2 | |
| Location Alias: 00/04-27-38-20 W4M | |
| Location Alias 2: 00/04-27-038-20 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 038 | |
| Meridian: 4 | |
| Range: 20 | |
| Section: 27 | |
| County/Municipality: County of Stettler No. 6 | |
| Well Name: BEARSPAW UNIT STETTLER 4-27-38-20 | |
| Operator Name: Bearspaw Petroleum Ltd. | |
| License Number: 0000666 | |
| License Date: 1949-09-28 | |
| License Status: Issued | |
| Spud Date: 1949-10-12 | |
| Final Drill Date: 1949-11-22 | |
| Well Total Depth: 1646.80 m | |
| Surface Hole Latitude: 52.290566 | |
| Surface Hole Longitude: -112.787614 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1949-09-28 | Obtained License |
| 1949-10-27 | Drill Stem Test Performed |
| 1949-11-14 | Drill Stem Test Performed |
| 1949-11-15 | Drill Stem Test Performed |
| 1949-11-16 | Drill Stem Test Performed |
| 1949-11-17 | Drill Stem Test Performed |
| 1949-11-22 | Finished Drilling |
| 1949-11-22 | Production Casing Operation Performed |
| 1949-11-22 | Well Mode changed to Drilled and Cased |
| 1949-11-25 | Perforation Treatment Performed - Jet Perforation |
| 2017-05-09 | Perforation Treatment Performed - Jet Perforation |
| 2017-05-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2017-05-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2017-05-15 | Plug Back Performed |
| 2017-05-26 | Perforation Treatment Performed - Jet Perforation |
| 2017-05-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2017-06-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2017-06-14 | Perforation Treatment Performed - Jet Perforation |
| 2017-06-20 | Liner Casing Operation Performed |
| 2017-06-23 | Perforation Treatment Performed - Chemical Squeeze |
| 2017-12-01 | Well Began Production |
| 2017-12-01 | Well Fluid changed to Gas |
| 2017-12-01 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1949-11-25 | Perforation | 1583.10 | 1592.30 | 13 |
| 2017-05-29 | Acid Treatment | 1386.00 | 1387.50 | 0 |
| 2017-05-29 | Acid Treatment | 1391.50 | 1393.50 | 0 |
| 2017-06-08 | Acid Treatment | 1379.50 | 1381.00 | 0 |
| 2017-06-08 | Acid Treatment | 1386.00 | 1387.50 | 0 |
| 2017-06-08 | Acid Treatment | 1391.50 | 1393.50 | 0 |
| 2017-06-14 | Perforation | 180.00 | 181.00 | 13 |
| 2017-06-14 | Perforation | 195.00 | 196.00 | 13 |
| 2017-06-14 | Perforation | 270.00 | 271.00 | 13 |
| 2017-06-14 | Perforation | 349.00 | 350.00 | 13 |
| 2017-06-14 | Perforation | 555.00 | 556.00 | 13 |
| 2017-05-09 | Perforation | 1559.10 | 1561.80 | 17 |
| 2017-06-14 | Perforation | 623.00 | 624.00 | 13 |
| 2017-06-14 | Perforation | 660.00 | 661.00 | 13 |
| 2017-06-14 | Perforation | 1144.00 | 1145.00 | 13 |
| 2017-06-14 | Perforation | 1180.00 | 1181.00 | 13 |
| 2017-06-23 | Chemical Squeeze | 180.00 | 1181.00 | 0 |
| 2017-05-09 | Perforation | 1568.10 | 1570.00 | 17 |
| 2017-05-12 | Acid Treatment | 1559.10 | 1570.00 | 0 |
| 2017-05-15 | Packing Device Capped w/Cement | 1549.00 | 1557.00 | 0 |
| 2017-05-26 | Perforation | 1379.50 | 1381.00 | 17 |
| 2017-05-26 | Perforation | 1386.00 | 1387.50 | 17 |
| 2017-05-26 | Perforation | 1391.50 | 1393.50 | 17 |
| 2017-05-29 | Acid Treatment | 1379.50 | 1381.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 175 | 0.0 | 0.0 | 0.0 |
| 2018 | 2598 | 0.0 | 0.0 | 0.0 |
| 2019 | 3301 | 0.0 | 0.0 | 0.0 |
| 2020 | 1136 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-05-09 | No Incident Encountered | 0.00 | 0.00 |
| 2017-05-26 | No Incident Encountered | 0.00 | 0.00 |
| 2017-06-14 | No Incident Encountered | 0.00 | 0.00 |
| 2017-10-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]