If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0384202711020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.298682,"lon":-112.781932,"icon":""}]} |
| Location: 02/11-27-038-20W4/0 | |
| Location Alias: 02/11-27-38-20 W4M | |
| Location Alias 2: 02/11-27-038-20 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 038 | |
| Meridian: 4 | |
| Range: 20 | |
| Section: 27 | |
| County/Municipality: County of Stettler No. 6 | |
| Well Name: BEARSPAW 102 STETTLER 11-27-38-20 | |
| Operator Name: Bearspaw Petroleum Ltd. | |
| License Number: 0384497 | |
| License Date: 2007-11-08 | |
| License Status: Issued | |
| Spud Date: 2008-02-14 | |
| Final Drill Date: 2008-02-15 | |
| Well Total Depth: 709.00 m | |
| Surface Hole Latitude: 52.298682 | |
| Surface Hole Longitude: -112.781932 |
| Date | Event |
|---|---|
| 2007-11-08 | Obtained License |
| 2008-02-14 | Surface Casing Operation Performed |
| 2008-02-15 | Finished Drilling |
| 2008-02-15 | Well Mode changed to Drilled and Cased |
| 2008-02-16 | Production Casing Operation Performed |
| 2008-02-16 | Rig Released |
| 2008-05-12 | Well Log Performed |
| 2013-09-01 | Well Began Production |
| 2013-09-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2013-09-01 | Well Mode changed to Flowing |
| 2013-09-16 | Perforation Treatment Performed - Jet Perforation |
| 2013-09-18 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2013-09-16 | Perforation | 624.00 | 627.00 | 13 |
| 2013-09-16 | Perforation | 222.00 | 226.00 | 13 |
| 2013-09-16 | Perforation | 215.20 | 216.20 | 13 |
| 2013-09-16 | Perforation | 206.00 | 207.00 | 13 |
| 2013-09-18 | Multi-Stage Fracture | 624.00 | 627.00 | 0 |
| 2013-09-18 | Multi-Stage Fracture | 284.00 | 285.50 | 0 |
| 2013-09-18 | Multi-Stage Fracture | 278.00 | 280.50 | 0 |
| 2013-09-18 | Multi-Stage Fracture | 259.00 | 262.00 | 0 |
| 2013-09-18 | Multi-Stage Fracture | 246.50 | 251.00 | 0 |
| 2013-09-18 | Multi-Stage Fracture | 238.50 | 240.00 | 0 |
| 2013-09-18 | Multi-Stage Fracture | 233.00 | 236.00 | 0 |
| 2013-09-16 | Perforation | 284.00 | 285.50 | 13 |
| 2013-09-18 | Multi-Stage Fracture | 228.00 | 229.50 | 0 |
| 2013-09-18 | Multi-Stage Fracture | 222.00 | 226.00 | 0 |
| 2013-09-18 | Multi-Stage Fracture | 215.20 | 216.20 | 0 |
| 2013-09-18 | Multi-Stage Fracture | 206.00 | 207.00 | 0 |
| 2013-09-16 | Perforation | 278.00 | 280.50 | 13 |
| 2013-09-16 | Perforation | 259.00 | 262.00 | 13 |
| 2013-09-16 | Perforation | 256.00 | 258.00 | 13 |
| 2013-09-16 | Perforation | 246.50 | 251.00 | 13 |
| 2013-09-16 | Perforation | 238.50 | 240.00 | 13 |
| 2013-09-16 | Perforation | 233.00 | 236.00 | 13 |
| 2013-09-16 | Perforation | 228.00 | 229.50 | 13 |
For data sources see[4]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2013-09-18 | 2013-09-18 | 0 | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | N2 | 7727-37-9 | 100 | 100 | N/A |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2013 | 2350 | 0.0 | 0.0 | 0.0 |
| 2014 | 8550 | 0.0 | 0.0 | 0.0 |
| 2015 | 8679 | 0.0 | 0.0 | 0.0 |
| 2016 | 8423 | 0.0 | 0.0 | 0.0 |
| 2017 | 6695 | 0.0 | 0.0 | 0.0 |
| 2018 | 5186 | 0.0 | 0.0 | 0.0 |
| 2019 | 5663 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-09-16 | No Incident Encountered | 0.00 | 0.00 |
| 2013-09-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]