If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384202806022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.295631,"lon":-112.805022,"icon":""}]} |
Location: 02/06-28-038-20W4/2 | |
Location Alias: 02/06-28-38-20 W4M | |
Location Alias 2: 02/06-28-038-20 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 20 | |
Section: 28 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: BEARSPAW 102 STETTLER 6-28-38-20 | |
Operator Name: Bearspaw Petroleum Ltd. | |
License Number: 0392751 | |
License Date: 2008-01-23 | |
License Status: Amended | |
Spud Date: 2008-02-22 | |
Final Drill Date: 2008-02-24 | |
Well Total Depth: 683.00 m | |
Surface Hole Latitude: 52.295631 | |
Surface Hole Longitude: -112.805022 |
Date | Event |
---|---|
2008-01-23 | Obtained License |
2008-02-22 | Surface Casing Operation Performed |
2008-02-24 | Finished Drilling |
2008-02-24 | Production Casing Operation Performed |
2008-02-24 | Rig Released |
2008-02-24 | Well Mode changed to Drilled and Cased |
2008-05-11 | Well Log Performed |
2011-12-27 | Perforation Treatment Performed - Jet Perforation |
2013-11-29 | Perforation Treatment Performed - Jet Perforation |
2013-12-01 | Well Began Production |
2013-12-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
2013-12-01 | Well Mode changed to Flowing |
2014-01-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-02-15 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-12-27 | Perforation | 624.50 | 626.50 | 13 |
2013-11-29 | Perforation | 240.50 | 244.50 | 13 |
2013-11-29 | Perforation | 232.50 | 235.00 | 13 |
2013-11-29 | Perforation | 228.80 | 230.30 | 13 |
2013-11-29 | Perforation | 226.70 | 227.70 | 13 |
2013-11-29 | Perforation | 220.00 | 222.20 | 13 |
2013-11-29 | Perforation | 211.70 | 213.20 | 13 |
2014-01-07 | Multi-Stage Fracture | 624.50 | 626.50 | 0 |
2014-01-07 | Multi-Stage Fracture | 312.00 | 313.50 | 0 |
2014-01-07 | Multi-Stage Fracture | 306.40 | 307.40 | 0 |
2014-01-07 | Multi-Stage Fracture | 293.00 | 294.00 | 0 |
2013-11-29 | Perforation | 312.00 | 313.50 | 13 |
2014-01-07 | Multi-Stage Fracture | 268.20 | 271.70 | 0 |
2014-01-07 | Multi-Stage Fracture | 265.20 | 266.70 | 0 |
2014-01-07 | Multi-Stage Fracture | 259.00 | 261.50 | 0 |
2014-01-07 | Multi-Stage Fracture | 252.50 | 257.50 | 0 |
2014-01-07 | Multi-Stage Fracture | 247.00 | 248.50 | 0 |
2014-01-07 | Multi-Stage Fracture | 240.50 | 244.50 | 0 |
2014-01-07 | Multi-Stage Fracture | 232.50 | 235.00 | 0 |
2014-01-07 | Multi-Stage Fracture | 228.80 | 230.30 | 0 |
2014-01-07 | Multi-Stage Fracture | 220.00 | 222.00 | 0 |
2014-01-07 | Multi-Stage Fracture | 211.70 | 213.20 | 0 |
2013-11-29 | Perforation | 306.40 | 307.40 | 13 |
2014-02-15 | Multi-Stage Fracture | 624.50 | 626.50 | 0 |
2014-02-15 | Multi-Stage Fracture | 312.00 | 313.50 | 0 |
2014-02-15 | Multi-Stage Fracture | 306.40 | 307.40 | 0 |
2014-02-15 | Multi-Stage Fracture | 293.00 | 294.00 | 0 |
2014-02-15 | Multi-Stage Fracture | 268.20 | 271.70 | 0 |
2014-02-15 | Multi-Stage Fracture | 265.20 | 266.70 | 0 |
2014-02-15 | Multi-Stage Fracture | 259.00 | 261.50 | 0 |
2014-02-15 | Multi-Stage Fracture | 252.50 | 257.50 | 0 |
2014-02-15 | Multi-Stage Fracture | 247.00 | 248.50 | 0 |
2014-02-15 | Multi-Stage Fracture | 240.50 | 244.50 | 0 |
2013-11-29 | Perforation | 293.00 | 294.00 | 13 |
2014-02-15 | Multi-Stage Fracture | 232.50 | 235.00 | 0 |
2014-02-15 | Multi-Stage Fracture | 228.80 | 230.30 | 0 |
2014-02-15 | Multi-Stage Fracture | 220.00 | 222.00 | 0 |
2014-02-15 | Multi-Stage Fracture | 211.70 | 213.20 | 0 |
2013-11-29 | Perforation | 268.20 | 271.70 | 13 |
2013-11-29 | Perforation | 265.20 | 266.70 | 13 |
2013-11-29 | Perforation | 259.00 | 261.50 | 13 |
2013-11-29 | Perforation | 252.50 | 257.50 | 13 |
2013-11-29 | Perforation | 247.00 | 248.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 672 | 0.0 | 0.0 | 0.0 |
2014 | 8568 | 0.0 | 0.0 | 0.0 |
2015 | 8583 | 0.0 | 0.0 | 0.0 |
2016 | 8423 | 0.0 | 0.0 | 0.0 |
2017 | 6502 | 0.0 | 0.0 | 0.0 |
2018 | 5154 | 0.0 | 0.0 | 0.0 |
2019 | 5776 | 0.0 | 0.0 | 0.0 |
2020 | 2136 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-11-29 | No Incident Encountered | 0.00 | 0.00 |
2014-01-07 | No Incident Encountered | 0.00 | 0.00 |
2014-02-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]