If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384203602000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.306086,"lon":-112.731745,"icon":""}]} |
Location: 00/02-36-038-20W4/0 | |
Location Alias: 00/02-36-38-20 W4M | |
Location Alias 2: 00/02-36-038-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 20 | |
Section: 36 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: BEARSPAW STETTLER 2-36-38-20 | |
Operator Name: Bearspaw Petroleum Ltd. | |
License Number: 0419533 | |
License Date: 2010-04-01 | |
License Status: Amended | |
Spud Date: 2010-09-24 | |
Final Drill Date: 2010-09-28 | |
Well Total Depth: 776.00 m | |
Surface Hole Latitude: 52.306086 | |
Surface Hole Longitude: -112.731745 |
Date | Event |
---|---|
2010-04-01 | Obtained License |
2010-09-24 | Direction Drilling Operation Performed - Deviate |
2010-09-26 | Surface Casing Operation Performed |
2010-09-28 | Finished Drilling |
2010-09-28 | Production Casing Operation Performed |
2010-09-28 | Well Mode changed to Drilled and Cased |
2010-09-30 | Rig Released |
2010-12-18 | Well Log Performed |
2013-09-26 | Perforation Treatment Performed - Jet Perforation |
2013-10-01 | Well Began Production |
2013-10-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
2013-10-01 | Well Mode changed to Flowing |
2013-10-09 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-09-24 | 20.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-09-26 | Perforation | 701.00 | 703.00 | 13 |
2013-09-26 | Perforation | 251.50 | 253.50 | 13 |
2013-09-26 | Perforation | 243.30 | 244.80 | 13 |
2013-09-26 | Perforation | 239.30 | 240.30 | 13 |
2013-09-26 | Perforation | 228.00 | 231.00 | 13 |
2013-09-26 | Perforation | 225.50 | 227.00 | 13 |
2013-09-26 | Perforation | 222.20 | 223.20 | 13 |
2013-10-09 | Multi-Stage Fracture | 701.00 | 703.00 | 0 |
2013-10-09 | Multi-Stage Fracture | 310.00 | 313.00 | 0 |
2013-10-09 | Multi-Stage Fracture | 290.50 | 292.00 | 0 |
2013-10-09 | Multi-Stage Fracture | 284.00 | 287.50 | 0 |
2013-09-26 | Perforation | 310.00 | 313.00 | 13 |
2013-10-09 | Multi-Stage Fracture | 280.20 | 282.70 | 0 |
2013-10-09 | Multi-Stage Fracture | 271.00 | 273.00 | 0 |
2013-10-09 | Multi-Stage Fracture | 260.00 | 263.00 | 0 |
2013-10-09 | Multi-Stage Fracture | 255.00 | 256.50 | 0 |
2013-10-09 | Multi-Stage Fracture | 243.30 | 244.80 | 0 |
2013-10-09 | Multi-Stage Fracture | 228.00 | 231.00 | 0 |
2013-10-09 | Multi-Stage Fracture | 225.50 | 227.00 | 0 |
2013-09-26 | Perforation | 290.50 | 292.00 | 13 |
2013-09-26 | Perforation | 284.00 | 287.50 | 13 |
2013-09-26 | Perforation | 280.20 | 282.70 | 13 |
2013-09-26 | Perforation | 276.80 | 279.30 | 13 |
2013-09-26 | Perforation | 271.00 | 273.00 | 13 |
2013-09-26 | Perforation | 260.00 | 263.00 | 13 |
2013-09-26 | Perforation | 255.00 | 256.50 | 13 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-10-09 | 2013-10-09 | 689 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 100 | N/A |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 1736 | 0.0 | 0.0 | 0.0 |
2014 | 8568 | 0.0 | 0.0 | 0.0 |
2015 | 8679 | 0.0 | 0.0 | 0.0 |
2016 | 8423 | 0.0 | 0.0 | 0.0 |
2017 | 6670 | 0.0 | 0.0 | 0.0 |
2018 | 5089 | 0.0 | 0.0 | 0.0 |
2019 | 6736 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-09-26 | No Incident Encountered | 0.00 | 0.00 |
2013-10-09 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]