If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0384210201020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.233322,"lon":-112.890467,"icon":""}]} |
| Location: 02/01-02-038-21W4/0 | |
| Location Alias: 02/01-02-38-21 W4M | |
| Location Alias 2: 02/01-02-038-21 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 038 | |
| Meridian: 4 | |
| Range: 21 | |
| Section: 02 | |
| County/Municipality: County of Stettler No. 6 | |
| Well Name: BEARSPAW 102 OBERLIN 1-2-38-21 | |
| Operator Name: Bearspaw Petroleum Ltd. | |
| License Number: 0362819 | |
| License Date: 2006-09-08 | |
| License Status: Issued | |
| Spud Date: 2006-12-09 | |
| Final Drill Date: 2006-12-11 | |
| Well Total Depth: 701.00 m | |
| Surface Hole Latitude: 52.233322 | |
| Surface Hole Longitude: -112.890467 |
| Date | Event |
|---|---|
| 2006-09-08 | Obtained License |
| 2006-12-10 | Surface Casing Operation Performed |
| 2006-12-11 | Finished Drilling |
| 2006-12-11 | Well Mode changed to Drilled and Cased |
| 2006-12-12 | Production Casing Operation Performed |
| 2006-12-13 | Rig Released |
| 2007-07-12 | Well Log Performed |
| 2007-11-07 | Perforation Treatment Performed - Jet Perforation |
| 2007-11-19 | Perforation Treatment Performed - Fractured |
| 2009-01-17 | Well Began Production |
| 2009-01-17 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2009-01-17 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2007-11-07 | Perforation | 324.80 | 344.30 | 14 |
| 2007-11-07 | Perforation | 258.00 | 260.00 | 14 |
| 2007-11-07 | Perforation | 253.60 | 256.10 | 14 |
| 2007-11-07 | Perforation | 243.00 | 244.50 | 14 |
| 2007-11-07 | Perforation | 240.50 | 242.00 | 14 |
| 2007-11-07 | Perforation | 236.80 | 237.80 | 14 |
| 2007-11-07 | Perforation | 233.20 | 235.20 | 14 |
| 2007-11-07 | Perforation | 192.60 | 193.60 | 14 |
| 2007-11-07 | Perforation | 148.30 | 152.80 | 14 |
| 2007-11-19 | Fracture | 324.80 | 344.30 | 0 |
| 2007-11-19 | Fracture | 337.00 | 338.50 | 0 |
| 2007-11-07 | Perforation | 337.00 | 338.50 | 14 |
| 2007-11-19 | Fracture | 325.30 | 326.30 | 0 |
| 2007-11-19 | Fracture | 294.50 | 296.00 | 0 |
| 2007-11-19 | Fracture | 292.50 | 293.50 | 0 |
| 2007-11-19 | Fracture | 286.70 | 288.20 | 0 |
| 2007-11-19 | Fracture | 282.50 | 284.50 | 0 |
| 2007-11-19 | Fracture | 278.50 | 279.50 | 0 |
| 2007-11-19 | Fracture | 262.50 | 263.50 | 0 |
| 2007-11-19 | Fracture | 258.00 | 260.00 | 0 |
| 2007-11-19 | Fracture | 253.60 | 256.10 | 0 |
| 2007-11-19 | Fracture | 243.00 | 244.50 | 0 |
| 2007-11-07 | Perforation | 325.30 | 326.30 | 14 |
| 2007-11-19 | Fracture | 240.50 | 242.00 | 0 |
| 2007-11-19 | Fracture | 236.80 | 237.80 | 0 |
| 2007-11-19 | Fracture | 233.20 | 235.20 | 0 |
| 2007-11-19 | Fracture | 192.60 | 193.60 | 0 |
| 2007-11-19 | Fracture | 148.30 | 152.80 | 0 |
| 2007-11-07 | Perforation | 294.50 | 296.00 | 14 |
| 2007-11-07 | Perforation | 292.50 | 293.50 | 14 |
| 2007-11-07 | Perforation | 286.70 | 288.20 | 14 |
| 2007-11-07 | Perforation | 282.50 | 284.50 | 14 |
| 2007-11-07 | Perforation | 278.50 | 279.50 | 14 |
| 2007-11-07 | Perforation | 262.50 | 263.50 | 14 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2009 | 7198 | 0.0 | 0.0 | 0.0 |
| 2010 | 8383 | 0.0 | 0.0 | 0.0 |
| 2011 | 7788 | 0.0 | 0.0 | 0.0 |
| 2012 | 5377 | 0.0 | 0.0 | 0.0 |
| 2013 | 8759 | 0.0 | 0.0 | 0.0 |
| 2014 | 8571 | 0.0 | 0.0 | 0.0 |
| 2015 | 8679 | 0.0 | 0.0 | 0.0 |
| 2016 | 7415 | 0.0 | 0.0 | 0.0 |
| 2017 | 6686 | 0.0 | 0.0 | 0.0 |
| 2018 | 4895 | 0.0 | 0.0 | 0.0 |
| 2019 | 5770 | 0.0 | 0.0 | 0.0 |
| 2020 | 2136 | 0.0 | 0.0 | 0.0 |
For data sources see[5]