If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384211406000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.264468,"lon":-112.900831,"icon":""}]} |
Location: 00/06-14-038-21W4/0 | |
Location Alias: 00/06-14-38-21 W4M | |
Location Alias 2: 00/06-14-038-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 21 | |
Section: 14 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: NEW BRITISH INTER-ROCK 6-14 | |
Operator Name: Amax Petroleum Of Canada Inc. | |
License Number: 0001434 | |
License Date: 1950-05-06 | |
License Status: RecExempt | |
Spud Date: 1950-05-12 | |
Final Drill Date: 1950-06-02 | |
Well Total Depth: 1334.40 m | |
Surface Hole Latitude: 52.264468 | |
Surface Hole Longitude: -112.900831 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1950-05-06 | Obtained License |
1950-06-01 | Drill Stem Test Performed |
1950-06-02 | Drill Stem Test Performed |
1950-06-02 | Finished Drilling |
1950-06-02 | Well Mode changed to Drilled and Cased |
1950-06-05 | Production Casing Operation Performed |
1950-06-08 | Perforation Treatment Performed - Open-Hole Completion |
1950-07-17 | Well Began Production |
1950-07-17 | Well Fluid changed to Crude Oil |
1950-07-17 | Well Mode changed to Pumping |
1952-08-11 | Well Fluid changed to Crude Oil |
1952-08-11 | Well Mode changed to Suspended |
1952-08-20 | Perforation Treatment Performed - Cement Squeeze |
1952-08-23 | Perforation Treatment Performed - Jet Perforation |
1952-08-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1952-09-20 | Perforation Treatment Performed - Jet Perforation |
1952-09-23 | Perforation Treatment Performed - Acid Wash - No Pressure |
1953-02-26 | Perforation Treatment Performed - Cement Squeeze |
1953-03-02 | Perforation Treatment Performed - Cement Squeeze |
1953-04-07 | Perforation Treatment Performed - Bullet Perforation |
1953-04-11 | Perforation Treatment Performed - Acid Wash - No Pressure |
1953-04-16 | Perforation Treatment Performed - Cement Squeeze |
1953-04-20 | Perforation Treatment Performed - Acid Wash - No Pressure |
1953-04-20 | Perforation Treatment Performed - Jet Perforation |
1954-04-12 | Well Fluid changed to Gas |
1954-04-12 | Well Mode changed to Flowing |
1958-05-27 | Well Fluid changed to Gas |
1958-05-27 | Well Mode changed to Suspended |
1975-09-20 | Perforation Treatment Performed - Jet Perforation |
1975-09-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-09-23 | Perforation Treatment Performed - Jet Perforation |
1975-09-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-09-24 | Perforation Treatment Performed - Bridge Plug No Cement Required |
1982-10-12 | Perforation Treatment Performed - Cement Squeeze |
1982-10-12 | Well Abandoned |
1982-10-12 | Well Fluid changed to Gas |
1982-10-12 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1950-06-08 | Open Hole/Barefoot Completion | 1332.90 | 1334.40 | 0 |
1953-04-11 | Acid Wash | 1326.20 | 1328.00 | 0 |
1953-04-16 | Cement Squeeze | 1326.20 | 1328.00 | 0 |
1953-04-20 | Perforation | 1326.20 | 1328.00 | 10 |
1953-04-20 | Acid Wash | 1326.20 | 1328.00 | 0 |
1975-09-20 | Perforation | 1317.00 | 1318.60 | 13 |
1975-09-21 | Acid Treatment | 1317.00 | 1318.60 | 0 |
1975-09-23 | Perforation | 1188.70 | 1191.20 | 13 |
1975-09-24 | Acid Treatment | 1188.70 | 1191.20 | 0 |
1975-09-24 | Bridge Plug, No Cement | 1210.00 | 1210.00 | 0 |
1982-10-12 | Cement Squeeze | 1188.70 | 1191.20 | 0 |
1952-08-20 | Cement Squeeze | 1332.90 | 1334.40 | 0 |
1952-08-23 | Perforation | 1187.20 | 1193.90 | 26 |
1952-08-25 | Acid Treatment | 1187.20 | 1193.90 | 0 |
1952-09-20 | Perforation | 1326.20 | 1328.00 | 13 |
1952-09-23 | Acid Wash | 1326.20 | 1328.00 | 0 |
1953-02-26 | Cement Squeeze | 1326.20 | 1328.00 | 0 |
1953-03-02 | Cement Squeeze | 1187.20 | 1193.90 | 0 |
1953-04-07 | Bullet Perforation | 1326.20 | 1328.00 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]