X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384211406000

Well Details

Well ID: 0384211406000
Loading map...
Location: 00/06-14-038-21W4/0
Location Alias: 00/06-14-38-21 W4M
Location Alias 2: 00/06-14-038-21 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 21
Section: 14
County/Municipality: County of Stettler No. 6
Well Name: NEW BRITISH INTER-ROCK 6-14
Operator Name: Amax Petroleum Of Canada Inc.
License Number: 0001434
License Date: 1950-05-06
License Status: RecExempt
Spud Date: 1950-05-12
Final Drill Date: 1950-06-02
Well Total Depth: 1334.40 m
Surface Hole Latitude: 52.264468
Surface Hole Longitude: -112.900831

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-05-06 Obtained License
1950-06-01 Drill Stem Test Performed
1950-06-02 Drill Stem Test Performed
1950-06-02 Finished Drilling
1950-06-02 Well Mode changed to Drilled and Cased
1950-06-05 Production Casing Operation Performed
1950-06-08 Perforation Treatment Performed - Open-Hole Completion
1950-07-17 Well Began Production
1950-07-17 Well Fluid changed to Crude Oil
1950-07-17 Well Mode changed to Pumping
1952-08-11 Well Fluid changed to Crude Oil
1952-08-11 Well Mode changed to Suspended
1952-08-20 Perforation Treatment Performed - Cement Squeeze
1952-08-23 Perforation Treatment Performed - Jet Perforation
1952-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-09-20 Perforation Treatment Performed - Jet Perforation
1952-09-23 Perforation Treatment Performed - Acid Wash - No Pressure
1953-02-26 Perforation Treatment Performed - Cement Squeeze
1953-03-02 Perforation Treatment Performed - Cement Squeeze
1953-04-07 Perforation Treatment Performed - Bullet Perforation
1953-04-11 Perforation Treatment Performed - Acid Wash - No Pressure
1953-04-16 Perforation Treatment Performed - Cement Squeeze
1953-04-20 Perforation Treatment Performed - Acid Wash - No Pressure
1953-04-20 Perforation Treatment Performed - Jet Perforation
1954-04-12 Well Fluid changed to Gas
1954-04-12 Well Mode changed to Flowing
1958-05-27 Well Fluid changed to Gas
1958-05-27 Well Mode changed to Suspended
1975-09-20 Perforation Treatment Performed - Jet Perforation
1975-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-09-23 Perforation Treatment Performed - Jet Perforation
1975-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-09-24 Perforation Treatment Performed - Bridge Plug No Cement Required
1982-10-12 Perforation Treatment Performed - Cement Squeeze
1982-10-12 Well Abandoned
1982-10-12 Well Fluid changed to Gas
1982-10-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-06-08 Open Hole/Barefoot Completion 1332.90 1334.40 0
1953-04-11 Acid Wash 1326.20 1328.00 0
1953-04-16 Cement Squeeze 1326.20 1328.00 0
1953-04-20 Perforation 1326.20 1328.00 10
1953-04-20 Acid Wash 1326.20 1328.00 0
1975-09-20 Perforation 1317.00 1318.60 13
1975-09-21 Acid Treatment 1317.00 1318.60 0
1975-09-23 Perforation 1188.70 1191.20 13
1975-09-24 Acid Treatment 1188.70 1191.20 0
1975-09-24 Bridge Plug, No Cement 1210.00 1210.00 0
1982-10-12 Cement Squeeze 1188.70 1191.20 0
1952-08-20 Cement Squeeze 1332.90 1334.40 0
1952-08-23 Perforation 1187.20 1193.90 26
1952-08-25 Acid Treatment 1187.20 1193.90 0
1952-09-20 Perforation 1326.20 1328.00 13
1952-09-23 Acid Wash 1326.20 1328.00 0
1953-02-26 Cement Squeeze 1326.20 1328.00 0
1953-03-02 Cement Squeeze 1187.20 1193.90 0
1953-04-07 Bullet Perforation 1326.20 1328.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References