X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384211506002

Well Details

Well ID: 0384211506002
Loading map...
Location: 00/06-15-038-21W4/2
Location Alias: 00/06-15-38-21 W4M
Location Alias 2: 00/06-15-038-21 W4/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 21
Section: 15
County/Municipality: County of Stettler No. 6
Well Name: TEAC NEVIS 6-15-38-21
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0299066
License Date: 2003-12-16
License Status: Amended
Spud Date: 2004-02-08
Final Drill Date: 2004-02-13
Well Total Depth: 1492.00 m
Surface Hole Latitude: 52.265529
Surface Hole Longitude: -112.923852

For data sources see[1][2]

Well History

Date Event
2003-12-16 Obtained License
2004-02-09 Surface Casing Operation Performed
2004-02-12 Well Log Performed
2004-02-13 Finished Drilling
2004-02-13 Well Mode changed to Drilled and Cased
2004-02-14 Production Casing Operation Performed
2004-02-14 Rig Released
2004-03-16 Well Log Performed
2004-03-18 Perforation Treatment Performed - Jet Perforation
2005-01-26 Well Log Performed
2005-01-27 Perforation Treatment Performed - Jet Perforation
2005-02-10 Perforation Treatment Performed - Jet Perforation
2005-02-10 Well Log Performed
2006-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-11-16 Plug Back Performed
2006-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-11-17 Plug Back Performed
2006-11-17 Well Log Performed
2006-11-17 Well Mode changed to Abandoned Zone
2006-11-25 Perforation Treatment Performed - Jet Perforation
2006-11-25 Well Log Performed
2006-11-27 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-03-18 Perforation 1352.00 1353.00 25
2006-11-25 Perforation 343.70 344.70 13
2006-11-25 Perforation 329.70 330.70 2
2006-11-25 Perforation 298.40 299.40 13
2006-11-25 Perforation 290.50 291.50 13
2006-11-25 Perforation 285.10 286.60 13
2006-11-25 Perforation 278.80 279.80 13
2006-11-25 Perforation 266.00 268.00 13
2006-11-25 Perforation 258.50 259.50 13
2006-11-25 Perforation 251.70 252.70 13
2006-11-25 Perforation 241.90 242.90 13
2004-03-18 Perforation 1354.50 1355.50 25
2006-11-27 Fracture 329.70 360.00 0
2006-11-27 Fracture 241.90 299.40 0
2005-01-27 Perforation 1337.00 1339.00 20
2005-02-10 Perforation 1247.00 1250.00 20
2006-11-16 Packing Device Capped w/Cement 1341.70 1349.70 0
2006-11-17 Packing Device Capped w/Cement 1317.00 1325.00 0
2006-11-17 Packing Device Capped w/Cement 1229.00 1237.00 0
2006-11-25 Perforation 358.00 360.00 13
2006-11-25 Perforation 348.80 349.80 13

For data sources see[4]



References