If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0384240301002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.233473,"lon":-113.343092,"icon":""}]} |
| Location: 00/01-03-038-24W4/2 | |
| Location Alias: 00/01-03-38-24 W4M | |
| Location Alias 2: 00/01-03-038-24 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 038 | |
| Meridian: 4 | |
| Range: 24 | |
| Section: 03 | |
| County/Municipality: Red Deer County | |
| Well Name: CNRL ET AL JOFFRE 1-3-38-24 | |
| Operator Name: NAL Resources Limited | |
| License Number: 0142197 | |
| License Date: 1989-12-15 | |
| License Status: Abandoned | |
| Spud Date: 1989-12-17 | |
| Final Drill Date: 1989-12-22 | |
| Well Total Depth: 1653.00 m | |
| Surface Hole Latitude: 52.233473 | |
| Surface Hole Longitude: -113.343092 |
| Date | Event |
|---|---|
| 1989-12-15 | Obtained License |
| 1989-12-17 | Lost Circulation Occurred |
| 1989-12-17 | Surface Casing Operation Performed |
| 1989-12-22 | Finished Drilling |
| 1989-12-22 | Well Mode changed to Drilled and Cased |
| 1989-12-23 | Drill Stem Test Performed |
| 1989-12-23 | Well Log Performed |
| 1989-12-24 | Production Casing Operation Performed |
| 1989-12-25 | Rig Released |
| 1989-12-29 | Well Log Performed |
| 1989-12-30 | Perforation Treatment Performed - Jet Perforation |
| 1989-12-30 | Well Log Performed |
| 1990-01-14 | Perforation Treatment Performed - Jet Perforation |
| 1990-01-14 | Well Log Performed |
| 1990-02-01 | Well Began Production |
| 1990-02-01 | Well Fluid changed to Crude Oil |
| 1990-02-01 | Well Mode changed to Flowing |
| 1991-02-28 | Well Fluid changed to Crude Oil |
| 1991-02-28 | Well Mode changed to Suspended |
| 1991-03-10 | Perforation Treatment Performed - Alcohol Squeeze |
| 1991-03-10 | Perforation Treatment Performed - Fractured |
| 1991-11-01 | Well Fluid changed to Crude Oil |
| 1991-11-01 | Well Mode changed to Flowing |
| 1992-02-27 | Perforation Treatment Performed - Fractured |
| 1996-06-26 | Well Log Performed |
| 1996-08-08 | Well Log Performed |
| 1996-08-09 | Perforation Treatment Performed - Jet Perforation |
| 1996-08-16 | Perforation Treatment Performed - Remedial Casing |
| 1996-08-19 | Perforation Treatment Performed - Jet Perforation |
| 1996-08-19 | Well Log Performed |
| 1996-08-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1996-08-20 | Perforation Treatment Performed - Jet Perforation |
| 1996-08-20 | Well Fluid changed to Crude Oil |
| 1996-08-20 | Well Log Performed |
| 1996-08-20 | Well Mode changed to Pumping |
| 1996-08-21 | Perforation Treatment Performed - Remedial Casing |
| 2012-03-16 | Well Fluid changed to Crude Oil |
| 2012-03-16 | Well Mode changed to Suspended |
| 2013-02-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-02-04 | Plug Back Performed |
| 2013-02-06 | Well Log Performed |
| 2013-02-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-02-07 | Plug Back Performed |
| 2013-02-07 | Well Fluid changed to Crude Oil |
| 2013-02-07 | Well Mode changed to Abandoned Zone |
| 2013-02-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-02-08 | Perforation Treatment Performed - Jet Perforation |
| 2013-02-08 | Well Log Performed |
| 2013-02-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-02-09 | Perforation Treatment Performed - Remedial Casing |
| 2013-02-10 | Perforation Treatment Performed - Jet Perforation |
| 2013-02-10 | Well Log Performed |
| 2013-02-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-02-11 | Perforation Treatment Performed - Remedial Casing |
| 2013-02-24 | Perforation Treatment Performed - Jet Perforation |
| 2013-02-24 | Well Log Performed |
| 2013-02-25 | Perforation Treatment Performed - Cement Plug |
| 2013-02-25 | Perforation Treatment Performed - Remedial Casing |
| 2013-03-15 | Well Abandoned |
| 2013-03-15 | Well Fluid changed to Crude Oil |
| 2013-03-15 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1989-12-30 | Perforation | 1513.50 | 1517.50 | 13 |
| 1996-08-20 | Acid Treatment | 450.00 | 451.00 | 0 |
| 1996-08-20 | Perforation | 310.00 | 310.60 | 13 |
| 1996-08-21 | Remedial Casing Cementing | 450.00 | 451.00 | 0 |
| 1996-08-21 | Remedial Casing Cementing | 310.00 | 310.60 | 0 |
| 2013-02-04 | Packing Device Capped w/Cement | 1432.00 | 1440.00 | 0 |
| 2013-02-07 | Packing Device Capped w/Cement | 1357.00 | 1365.00 | 0 |
| 2013-02-07 | Packing Device Capped w/Cement | 587.00 | 595.00 | 0 |
| 2013-02-08 | Packing Device Capped w/Cement | 437.00 | 445.00 | 0 |
| 2013-02-08 | Perforation | 364.00 | 366.00 | 13 |
| 2013-02-09 | Remedial Casing Cementing | 364.00 | 366.00 | 0 |
| 1990-01-14 | Perforation | 1370.50 | 1372.50 | 13 |
| 2013-02-09 | Packing Device Capped w/Cement | 302.00 | 360.00 | 0 |
| 2013-02-10 | Perforation | 201.00 | 203.00 | 13 |
| 2013-02-11 | Remedial Casing Cementing | 201.00 | 203.00 | 0 |
| 2013-02-11 | Packing Device Capped w/Cement | 180.00 | 195.40 | 0 |
| 2013-02-24 | Perforation | 187.50 | 189.50 | 13 |
| 2013-02-25 | Remedial Casing Cementing | 187.50 | 189.50 | 0 |
| 2013-02-25 | Cement Plug | 95.00 | 220.00 | 0 |
| 1990-01-14 | Perforation | 1374.50 | 1375.00 | 13 |
| 1991-03-10 | Alchohol Squeeze | 1513.50 | 1517.50 | 0 |
| 1991-03-10 | Fracture | 1513.50 | 1517.50 | 0 |
| 1992-02-27 | Fracture | 1370.50 | 1375.00 | 0 |
| 1996-08-09 | Perforation | 600.00 | 601.00 | 13 |
| 1996-08-16 | Remedial Casing Cementing | 600.00 | 601.00 | 0 |
| 1996-08-19 | Perforation | 450.00 | 451.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1990 | 6578 | 0.0 | 0.0 | 0.0 |
| 1991 | 1202 | 0.0 | 0.0 | 0.0 |
| 1992 | 3971 | 0.0 | 0.0 | 0.0 |
| 1993 | 3446 | 0.0 | 0.0 | 0.0 |
| 1994 | 7119 | 0.0 | 0.0 | 0.0 |
| 1995 | 3009 | 0.0 | 0.0 | 0.0 |
| 1996 | 3604 | 0.0 | 0.0 | 0.0 |
| 1997 | 6978 | 0.0 | 0.0 | 0.0 |
| 1998 | 6772 | 0.0 | 0.0 | 0.0 |
| 1999 | 3250 | 0.0 | 0.0 | 0.0 |
| 2000 | 4932 | 0.0 | 0.0 | 0.0 |
| 2001 | 7911 | 0.0 | 0.0 | 0.0 |
| 2002 | 3842 | 0.0 | 0.0 | 0.0 |
| 2004 | 5888 | 0.0 | 0.0 | 0.0 |
| 2005 | 7954 | 0.0 | 0.0 | 0.0 |
| 2006 | 6695 | 0.0 | 0.0 | 0.0 |
| 2007 | 6475 | 0.0 | 0.0 | 0.0 |
| 2008 | 8762 | 0.0 | 0.0 | 0.0 |
| 2009 | 8520 | 0.0 | 0.0 | 0.0 |
| 2010 | 8731 | 0.0 | 0.0 | 0.0 |
| 2011 | 8715 | 0.0 | 0.0 | 0.0 |
| 2012 | 2110 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1989-12-17 | Lost Circulation | 0.10 | 183.00 |
| 2013-02-12 | No Incident Encountered | 0.00 | 0.00 |
| 2013-03-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]