X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384272502000

Well Details

Well ID: 0384272502000
Loading map...
Location: 00/02-25-038-27W4/0
Location Alias: 00/02-25-38-27 W4M
Location Alias 2: 00/02-25-038-27 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 27
Section: 25
County/Municipality: Red Deer County
Well Name: COGI JOFFRE 2-25-38-27
Operator Name: DEL Canada GP Ltd.
License Number: 0016012
License Date: 1958-10-08
License Status: Issued
Spud Date: 1958-10-18
Final Drill Date: 1958-11-14
Well Total Depth: 2204.30 m
Surface Hole Latitude: 52.290377
Surface Hole Longitude: -113.727727

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-10-08 Obtained License
1958-11-14 Finished Drilling
1958-11-14 Well Mode changed to Drilled and Cased
1958-11-15 Drill Stem Test Performed
1958-11-17 Production Casing Operation Performed
1958-11-19 Perforation Treatment Performed - Open-Hole Completion
1958-12-04 Well Began Production
1958-12-04 Well Fluid changed to Crude Oil
1958-12-04 Well Mode changed to Flowing
1972-08-16 Well Fluid changed to Crude Oil
1972-08-16 Well Mode changed to Pumping
1973-10-31 Perforation Treatment Performed - Cement Plug
1973-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-11-01 Well Fluid changed to Crude Oil
1973-11-01 Well Mode changed to Pumping
1973-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-11-19 Open Hole/Barefoot Completion 2173.80 2200.00 0
1973-10-31 Cement Plug 2186.90 2188.50 0
1973-11-01 Acid Treatment 2173.80 2186.90 0
1973-12-19 Acid Treatment 2173.80 2186.90 0
1981-12-01 Acid Treatment 2173.80 2186.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4152 0.0 0.0 0.0
1968 4639 0.0 0.0 0.0
1969 3543 0.0 0.0 0.0
1970 6567 0.0 0.0 0.0
1971 7890 0.0 0.0 0.0
1972 6982 0.0 0.0 0.0
1973 6231 0.0 0.0 0.0
1974 6416 0.0 0.0 0.0
1975 4105 0.0 0.0 0.0
1976 7757 0.0 0.0 0.0
1977 7170 0.0 0.0 0.0
1978 7423 0.0 0.0 0.0
1979 7404 0.0 0.0 0.0
1980 7718 0.0 0.0 0.0
1981 8575 0.0 0.0 0.0
1982 8378 0.0 0.0 0.0
1983 8430 0.0 0.0 0.0
1984 8494 0.0 0.0 0.0
1985 8094 0.0 0.0 0.0
1986 7140 0.0 0.0 0.0
1987 8381 0.0 0.0 0.0
1988 7615 0.0 0.0 0.0
1989 7461 0.0 0.0 0.0
1990 7378 0.0 0.0 0.0
1991 8081 0.0 0.0 0.0
1992 5834 0.0 0.0 0.0
1993 5274 0.0 0.0 0.0
1994 6876 0.0 0.0 0.0
1995 8363 0.0 0.0 0.0
1996 8570 0.0 0.0 0.0
1997 8397 0.0 0.0 0.0
1998 8633 0.0 0.0 0.0
1999 8454 0.0 0.0 0.0
2000 8257 0.0 0.0 0.0
2001 6601 0.0 0.0 0.0
2002 7884 0.0 0.0 0.0
2003 7827 0.0 0.0 0.0
2004 8250 0.0 0.0 0.0
2005 8334 0.0 0.0 0.0
2006 8472 0.0 0.0 0.0
2007 7319 0.0 0.0 0.0
2008 1003 0.0 0.0 0.0
2009 5788 0.0 0.0 0.0
2010 5307 0.0 0.0 0.0
2011 8078 0.0 0.0 0.0
2012 7668 0.0 0.0 0.0
2013 7788 0.0 0.0 0.0
2014 6354 0.0 0.0 0.0
2015 8519 0.0 0.0 0.0
2016 7763 0.0 0.0 0.0
2017 6848 0.0 0.0 0.0
2018 5136 0.0 0.0 0.0
2019 3148 0.0 0.0 0.0

For data sources see[5]

References