X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384273308000

Well Details

Well ID: 0384273308000
Loading map...
Location: 00/08-33-038-27W4/0
Location Alias: 00/08-33-38-27 W4M
Location Alias 2: 00/08-33-038-27 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 27
Section: 33
County/Municipality: Red Deer
Well Name: HRR JOFFRE 8-33-38-27
Operator Name: Hard Rock Resources Ltd.
License Number: 0117892
License Date: 1985-09-25
License Status: Amended
Spud Date: 1985-09-27
Final Drill Date: 1985-10-23
Well Total Depth: 2144.00 m
Surface Hole Latitude: 52.314440
Surface Hole Longitude: -113.805098

For data sources see[1][2]

Well History

Date Event
1985-09-25 Obtained License
1985-09-28 Surface Casing Operation Performed
1985-09-30 Direction Drilling Operation Performed - Deviate
1985-10-12 Lost Circulation Occurred
1985-10-23 Finished Drilling
1985-10-23 Well Mode changed to Drilled and Cased
1985-10-25 Production Casing Operation Performed
1985-10-25 Well Log Performed
1985-10-26 Rig Released
1985-10-30 Well Log Performed
1985-12-30 Perforation Treatment Performed - Jet Perforation
1986-01-01 Perforation Treatment Performed - Bridge Plug No Cement Required
1986-01-02 Perforation Treatment Performed - Bridge Plug No Cement Required
1986-01-02 Perforation Treatment Performed - Jet Perforation
1986-01-03 Perforation Treatment Performed - Jet Perforation
1986-01-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-01-07 Perforation Treatment Performed - Bridge Plug No Cement Required
1986-01-07 Perforation Treatment Performed - Jet Perforation
1986-01-09 Perforation Treatment Performed - Fractured
1986-02-01 Well Began Production
1986-02-01 Well Fluid changed to Crude Oil
1986-02-01 Well Mode changed to Flowing
2006-05-04 Well Fluid changed to Crude Oil
2006-05-04 Well Mode changed to Suspended
2010-04-08 Well Fluid changed to Crude Oil
2010-04-08 Well Mode changed to Flowing
2011-11-30 Well Fluid changed to Crude Oil
2011-11-30 Well Mode changed to Suspended
2012-07-03 Well Fluid changed to Crude Oil
2012-07-03 Well Mode changed to Flowing
2015-08-19 Well Fluid changed to Crude Oil
2015-08-19 Well Mode changed to Suspended
2016-01-04 Well Fluid changed to Crude Oil
2016-01-04 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-09-30 255.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-12-30 Perforation 2109.00 2116.90 13
1986-01-01 Bridge Plug, No Cement 2108.50 2108.50 0
1986-01-02 Perforation 2101.00 2107.00 14
1986-01-02 Bridge Plug, No Cement 2100.00 2100.00 0
1986-01-03 Perforation 2093.00 2099.00 13
1986-01-05 Acid Treatment 2093.00 2099.00 0
1986-01-07 Bridge Plug, No Cement 2072.00 2072.00 0
1986-01-07 Perforation 2058.00 2061.00 14
1986-01-09 Fracture 2058.00 2061.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 4622 0.0 0.0 0.0
1987 8709 0.0 0.0 0.0
1988 8663 0.0 0.0 0.0
1989 8519 0.0 0.0 0.0
1990 8581 0.0 0.0 0.0
1991 8759 0.0 0.0 0.0
1992 5992 0.0 0.0 0.0
1993 7599 0.0 0.0 0.0
1994 8539 0.0 0.0 0.0
1995 8735 0.0 0.0 0.0
1996 8399 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8358 0.0 0.0 0.0
1999 8591 0.0 0.0 0.0
2000 5135 0.0 0.0 0.0
2010 404 0.0 0.0 0.0
2012 1128 0.0 0.0 0.0
2013 523 0.0 0.0 0.0
2014 1521 0.0 0.0 0.0
2015 767 0.0 0.0 0.0
2016 5957 0.0 0.0 0.0
2017 3126 0.0 0.0 0.0
2018 1410 0.0 0.0 0.0
2019 3463 0.0 0.0 0.0
2020 1157 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-10-12 Lost Circulation 1893.00 1918.00

For data sources see[7]

References