X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384283506002

Well Details

Well ID: 0384283506002
Loading map...
Location: 00/06-35-038-28W4/2
Location Alias: 00/06-35-38-28 W4M
Location Alias 2: 00/06-35-038-28 W4/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 28
Section: 35
County/Municipality: Red Deer County
Well Name: NAL CYGNET 6-35-38-28
Operator Name: NAL Resources Limited
License Number: 0115135
License Date: 1985-06-06
License Status: Issued
Spud Date: 1985-08-07
Final Drill Date: 1985-08-14
Well Total Depth: 1926.00 m
Surface Hole Latitude: 52.310088
Surface Hole Longitude: -113.898419

For data sources see[1][2]

Well History

Date Event
1985-06-06 Obtained License
1985-08-07 Surface Casing Operation Performed
1985-08-14 Finished Drilling
1985-08-14 Well Log Performed
1985-08-14 Well Mode changed to Drilled and Cased
1985-08-15 Well Log Performed
1985-08-16 Drill Stem Test Performed
1985-08-17 Drill Stem Test Performed
1985-08-19 Production Casing Operation Performed
1985-08-19 Rig Released
1985-08-27 Well Log Performed
1985-08-30 Well Log Performed
1985-08-31 Perforation Treatment Performed - Jet Perforation
1985-09-01 Perforation Treatment Performed - Fractured
1985-09-19 Well Log Performed
1985-09-21 Perforation Treatment Performed - Jet Perforation
1985-09-22 Perforation Treatment Performed - Fractured
1985-10-01 Well Began Production
1985-10-01 Well Fluid changed to Crude Oil
1985-10-01 Well Mode changed to Flowing
1986-08-22 Well Fluid changed to Crude Oil
1986-08-22 Well Mode changed to Suspended
1995-11-18 Perforation Treatment Performed - Cement Squeeze
1995-11-18 Plug Back Performed
1995-11-18 Well Fluid changed to Crude Oil
1995-11-18 Well Mode changed to Abandoned Zone
1995-11-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-11-21 Perforation Treatment Performed - Jet Perforation
1995-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-11-22 Plug Back Performed
1995-11-23 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-08-31 Perforation 1886.00 1891.00 13
1995-11-23 Fracture 1859.00 1866.00 0
1985-09-01 Fracture 1886.00 1891.00 0
1985-09-21 Perforation 1674.50 1676.00 13
1985-09-22 Fracture 1674.50 1676.00 0
1995-11-18 Cement Squeeze 1674.50 1676.00 0
1995-11-21 Packing Device Capped w/Cement 1875.00 1883.00 0
1995-11-21 Perforation 1859.00 1861.00 13
1995-11-21 Perforation 1864.00 1866.00 13
1995-11-22 Packing Device Capped w/Cement 1875.00 1883.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 2183 0.0 0.0 0.0
1986 2520 0.0 0.0 0.0

For data sources see[5]

References