X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385022614003

Well Details

Well ID: 0385022614003
Loading map...
Location: 00/14-26-038-02W5/3
Location Alias: 00/14-26-38-02 W5M
Location Alias 2: 00/14-26-038-02 W5/03
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 02
Section: 26
County/Municipality: Red Deer County
Well Name: NAL MEDICINE RIVER 14-26-38-2
Operator Name: NAL Resources Limited
License Number: 0270188
License Date: 2002-05-22
License Status: Amended
Spud Date: 2002-06-13
Final Drill Date: 2002-06-23
Well Total Depth: 2199.00 m
Surface Hole Latitude: 52.302278
Surface Hole Longitude: -114.187418

For data sources see[1][2]

Well History

Date Event
2002-05-22 Obtained License
2002-06-14 Surface Casing Operation Performed
2002-06-15 Direction Drilling Operation Performed - Deviate
2002-06-22 Well Log Performed
2002-06-23 Finished Drilling
2002-06-23 Well Log Performed
2002-06-23 Well Mode changed to Drilled and Cased
2002-06-25 Production Casing Operation Performed
2002-06-25 Rig Released
2002-07-13 Well Log Performed
2002-07-20 Perforation Treatment Performed - Jet Perforation
2002-07-20 Well Log Performed
2002-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-07-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-07-29 Plug Back Performed
2002-07-30 Perforation Treatment Performed - Jet Perforation
2002-07-30 Well Log Performed
2002-08-02 Perforation Treatment Performed - Fractured
2002-08-09 Perforation Treatment Performed - Jet Perforation
2002-08-09 Well Log Performed
2002-08-10 Perforation Treatment Performed - Remedial Casing
2002-08-12 Well Log Performed
2002-08-14 Perforation Treatment Performed - Jet Perforation
2002-08-14 Perforation Treatment Performed - Remedial Casing
2002-08-14 Well Log Performed
2003-06-27 Well Log Performed
2003-07-06 Perforation Treatment Performed - Jet Perforation
2003-09-03 Well Began Production
2003-09-03 Well Fluid changed to Gas
2003-09-03 Well Mode changed to Flowing
2004-02-11 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-06-15 1718.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-07-20 Perforation 2142.50 2146.00 14
2002-08-02 Fracture 2103.00 2106.00 0
2002-08-02 Fracture 2107.00 2108.00 0
2002-08-09 Perforation 605.00 606.00 14
2002-08-10 Remedial Casing Cementing 605.00 606.00 0
2002-08-14 Perforation 450.00 451.00 14
2002-08-14 Remedial Casing Cementing 450.00 451.00 0
2003-07-06 Perforation 851.50 855.50 14
2002-07-20 Perforation 2136.00 2137.50 14
2002-07-22 Acid Treatment 2142.50 2146.00 0
2002-07-22 Acid Treatment 2136.00 2137.50 0
2002-07-29 Packing Device Capped w/Cement 2125.00 2133.00 0
2002-07-30 Perforation 2098.50 2099.50 14
2002-07-30 Perforation 2103.00 2106.00 14
2002-07-30 Perforation 2107.00 2108.00 14
2002-08-02 Fracture 2098.50 2099.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 2864 0.0 0.0 0.0
2004 940 0.0 0.0 0.0

For data sources see[6]

References