X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385030916032

Well Details

Well ID: 0385030916032
Loading map...
Location: 03/16-09-038-03W5/2
Location Alias: 03/16-09-38-03 W5M
Location Alias 2: 03/16-09-038-03 W5/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 09
County/Municipality: Red Deer County
Well Name: NAL GU#1 SYLAKE 16-9-38-3
Operator Name: NAL Resources Limited
License Number: 0166870
License Date: 1994-05-04
License Status: Amended
Spud Date: 1994-05-21
Final Drill Date: 1996-06-05
Well Total Depth: 2693.00 m
Surface Hole Latitude: 52.262493
Surface Hole Longitude: -114.361375

For data sources see[1][2]

Well History

Date Event
1994-05-04 Obtained License
1996-03-04 Well Log Performed
1996-05-27 Direction Drilling Operation Performed - Horizontal
1996-06-01 Well Log Performed
1996-06-05 Finished Drilling
1996-06-05 Well Mode changed to Drilled and Cased
1996-06-06 Liner Casing Operation Performed
1996-06-06 Well Log Performed
1996-06-16 Perforation Treatment Performed - Open-Hole Completion
1996-06-20 Perforation Treatment Performed - Cement Plug
1996-06-20 Perforation Treatment Performed - Open-Hole Completion
1996-06-22 Rig Released
1996-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-07-01 Well Began Production
1996-07-01 Well Fluid changed to Crude Oil
1996-07-01 Well Mode changed to Pumping
1997-03-07 Well Log Performed
2000-05-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-05-26 Plug Back Performed
2000-05-26 Well Fluid changed to Crude Oil
2000-05-26 Well Mode changed to Abandoned Zone
2000-06-17 Well Fluid changed to Crude Oil
2000-06-17 Well Mode changed to Abandoned and Whipstocked
2000-07-11 Perforation Treatment Performed - Bridge Plug No Cement Required

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-05-27 2183.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-06-16 Open Hole/Barefoot Completion 2263.00 2693.00 0
1996-06-20 Cement Plug 2333.50 2639.00 0
1996-06-20 Open Hole/Barefoot Completion 2263.00 2335.00 0
1996-06-24 Acid Treatment 2263.00 2335.00 0
2000-05-26 Packing Device Capped w/Cement 2157.00 2165.00 0
2000-07-11 Bridge Plug, No Cement 1250.00 1250.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 4422 0.0 0.0 0.0
1997 7196 0.0 0.0 0.0
1998 8171 0.0 0.0 0.0
1999 8738 0.0 0.0 0.0
2000 3431 0.0 0.0 0.0

For data sources see[6]

References