If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0385030916032 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.262493,"lon":-114.361375,"icon":""}]} |
| Location: 03/16-09-038-03W5/2 | |
| Location Alias: 03/16-09-38-03 W5M | |
| Location Alias 2: 03/16-09-038-03 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 038 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 09 | |
| County/Municipality: Red Deer County | |
| Well Name: NAL GU#1 SYLAKE 16-9-38-3 | |
| Operator Name: NAL Resources Limited | |
| License Number: 0166870 | |
| License Date: 1994-05-04 | |
| License Status: Amended | |
| Spud Date: 1994-05-21 | |
| Final Drill Date: 1996-06-05 | |
| Well Total Depth: 2693.00 m | |
| Surface Hole Latitude: 52.262493 | |
| Surface Hole Longitude: -114.361375 |
| Date | Event |
|---|---|
| 1994-05-04 | Obtained License |
| 1996-03-04 | Well Log Performed |
| 1996-05-27 | Direction Drilling Operation Performed - Horizontal |
| 1996-06-01 | Well Log Performed |
| 1996-06-05 | Finished Drilling |
| 1996-06-05 | Well Mode changed to Drilled and Cased |
| 1996-06-06 | Liner Casing Operation Performed |
| 1996-06-06 | Well Log Performed |
| 1996-06-16 | Perforation Treatment Performed - Open-Hole Completion |
| 1996-06-20 | Perforation Treatment Performed - Cement Plug |
| 1996-06-20 | Perforation Treatment Performed - Open-Hole Completion |
| 1996-06-22 | Rig Released |
| 1996-06-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1996-07-01 | Well Began Production |
| 1996-07-01 | Well Fluid changed to Crude Oil |
| 1996-07-01 | Well Mode changed to Pumping |
| 1997-03-07 | Well Log Performed |
| 2000-05-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2000-05-26 | Plug Back Performed |
| 2000-05-26 | Well Fluid changed to Crude Oil |
| 2000-05-26 | Well Mode changed to Abandoned Zone |
| 2000-06-17 | Well Fluid changed to Crude Oil |
| 2000-06-17 | Well Mode changed to Abandoned and Whipstocked |
| 2000-07-11 | Perforation Treatment Performed - Bridge Plug No Cement Required |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1996-05-27 | 2183.50 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1996-06-16 | Open Hole/Barefoot Completion | 2263.00 | 2693.00 | 0 |
| 1996-06-20 | Cement Plug | 2333.50 | 2639.00 | 0 |
| 1996-06-20 | Open Hole/Barefoot Completion | 2263.00 | 2335.00 | 0 |
| 1996-06-24 | Acid Treatment | 2263.00 | 2335.00 | 0 |
| 2000-05-26 | Packing Device Capped w/Cement | 2157.00 | 2165.00 | 0 |
| 2000-07-11 | Bridge Plug, No Cement | 1250.00 | 1250.10 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1996 | 4422 | 0.0 | 0.0 | 0.0 |
| 1997 | 7196 | 0.0 | 0.0 | 0.0 |
| 1998 | 8171 | 0.0 | 0.0 | 0.0 |
| 1999 | 8738 | 0.0 | 0.0 | 0.0 |
| 2000 | 3431 | 0.0 | 0.0 | 0.0 |
For data sources see[6]