X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385031006023

Well Details

Well ID: 0385031006023
Loading map...
Location: 02/06-10-038-03W5/3
Location Alias: 02/06-10-38-03 W5M
Location Alias 2: 02/06-10-038-03 W5/03
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 10
County/Municipality: Red Deer County
Well Name: NAL SYLVAN LAKE 6-10-38-3
Operator Name: NAL Resources Limited
License Number: 0164745
License Date: 1994-02-04
License Status: Suspension
Spud Date: 1994-03-04
Final Drill Date: 1996-07-13
Well Total Depth: 2522.50 m
Surface Hole Latitude: 52.252210
Surface Hole Longitude: -114.356709

For data sources see[1][2]

Well History

Date Event
1994-02-04 Obtained License
1996-06-01 Direction Drilling Operation Performed - Horizontal
1996-06-28 Well Log Performed
1996-07-10 Well Log Performed
1996-07-11 Liner Casing Operation Performed
1996-07-13 Finished Drilling
1996-07-13 Perforation Treatment Performed - Open-Hole Completion
1996-07-13 Well Mode changed to Drilled and Cased
1996-07-14 Rig Released
1996-07-15 Well Log Performed
1996-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-08-07 Well Log Performed
1996-09-09 Perforation Treatment Performed - Jet Perforation
1996-09-10 Perforation Treatment Performed - Jet Perforation
1996-09-12 Perforation Treatment Performed - Jet Perforation
1996-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-16 Well Log Performed
1996-11-01 Well Log Performed
1998-05-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-05-28 Perforation Treatment Performed - Jet Perforation
1998-05-28 Plug Back Performed
1998-05-28 Well Log Performed
1998-07-01 Well Began Production
1998-07-01 Well Fluid changed to Gas
1998-07-01 Well Mode changed to Flowing
2004-01-01 Well Fluid changed to Gas
2004-01-01 Well Mode changed to Pumping
2013-04-01 Well Fluid changed to Gas
2013-04-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-06-01 2173.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-07-13 Open Hole/Barefoot Completion 2246.40 2522.50 0
1996-07-17 Acid Treatment 2246.40 2522.50 0
1996-07-25 Acid Treatment 2253.00 2505.00 0
1996-09-09 Perforation 2440.00 2459.40 6
1996-09-10 Perforation 2411.60 2430.00 6
1996-09-12 Perforation 2255.00 2280.20 6
1996-09-14 Acid Treatment 2246.40 2522.50 0
1998-05-28 Packing Device Capped w/Cement 2227.00 2235.00 0
1998-05-28 Perforation 2178.00 2183.00 7

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 2169 0.0 0.0 0.0
1999 8275 0.0 0.0 0.0
2000 8184 0.0 0.0 0.0
2001 8379 0.0 0.0 0.0
2002 8286 0.0 0.0 0.0
2003 8220 0.0 0.0 0.0
2004 8655 0.0 0.0 0.0
2005 8504 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8675 0.0 0.0 0.0
2008 8577 0.0 0.0 0.0
2009 8689 0.0 0.0 0.0
2010 7581 0.0 0.0 0.0
2011 24 0.0 0.0 0.0

For data sources see[6]

References