If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0385031308000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.267655,"lon":-114.288466,"icon":""}]} |
| Location: 00/08-13-038-03W5/0 | |
| Location Alias: 00/08-13-38-03 W5M | |
| Location Alias 2: 00/08-13-038-03 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 038 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 13 | |
| County/Municipality: Red Deer County | |
| Well Name: CDN-SUP SYLAKE 8-13-38-3 | |
| Operator Name: ExxonMobil Canada Resources Company | |
| License Number: 0104383 | |
| License Date: 1983-11-28 | |
| License Status: Abandoned | |
| Spud Date: 1983-12-17 | |
| Final Drill Date: 1983-12-28 | |
| Well Total Depth: 1970.00 m | |
| Surface Hole Latitude: 52.267655 | |
| Surface Hole Longitude: -114.288466 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1983-11-28 | Obtained License |
| 1983-12-28 | Finished Drilling |
| 1983-12-28 | Well Mode changed to Drilled and Cased |
| 1983-12-30 | Production Casing Operation Performed |
| 1984-02-09 | Perforation Treatment Performed - Jet Perforation |
| 1984-02-09 | Well Log Performed |
| 1984-02-12 | Perforation Treatment Performed - Fractured |
| 1984-02-24 | Well Began Production |
| 1984-02-24 | Well Fluid changed to Crude Oil |
| 1984-02-24 | Well Mode changed to Pumping |
| 1986-09-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1987-10-01 | Well Fluid changed to Crude Oil |
| 1987-10-01 | Well Mode changed to Suspended |
| 1989-10-21 | Perforation Treatment Performed - Jet Perforation |
| 1989-10-21 | Well Log Performed |
| 1989-10-24 | Perforation Treatment Performed - Chemical Squeeze |
| 2000-03-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2000-03-14 | Perforation Treatment Performed - Jet Perforation |
| 2000-03-14 | Plug Back Performed |
| 2000-03-15 | Perforation Treatment Performed - Cement Plug |
| 2000-03-15 | Plug Back Performed |
| 2000-03-15 | Well Fluid changed to Crude Oil |
| 2000-03-15 | Well Mode changed to Abandoned Zone |
| 2000-07-12 | Well Abandoned |
| 2000-07-12 | Well Fluid changed to Crude Oil |
| 2000-07-12 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1984-02-09 | Perforation | 1901.50 | 1908.50 | 13 |
| 1984-02-12 | Fracture | 1901.50 | 1908.50 | 0 |
| 1986-09-12 | Acid Treatment | 1901.50 | 1908.50 | 0 |
| 1989-10-21 | Perforation | 1900.00 | 1904.00 | 13 |
| 1989-10-24 | Chemical Squeeze | 1900.00 | 1908.50 | 0 |
| 2000-03-14 | Packing Device Capped w/Cement | 1881.00 | 1889.00 | 0 |
| 2000-03-14 | Perforation | 360.00 | 361.00 | 14 |
| 2000-03-15 | Cement Plug | 0.10 | 361.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1984 | 4942 | 0.0 | 0.0 | 0.0 |
| 1985 | 7841 | 0.0 | 0.0 | 0.0 |
| 1986 | 4165 | 0.0 | 0.0 | 0.0 |
| 1987 | 2128 | 0.0 | 0.0 | 0.0 |
For data sources see[5]