X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385031601000

Well Details

Well ID: 0385031601000
Loading map...
Location: 00/01-16-038-03W5/0
Location Alias: 00/01-16-38-03 W5M
Location Alias 2: 00/01-16-038-03 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 16
County/Municipality: Red Deer County
Well Name: NAL GU#1 SYLAKE 16-9-38-3
Operator Name: NAL Resources Limited
License Number: 0166870
License Date: 1994-05-04
License Status: Amended
Spud Date: 1994-05-21
Final Drill Date: 1994-06-20
Well Total Depth: 2896.00 m
Surface Hole Latitude: 52.262493
Surface Hole Longitude: -114.361375

For data sources see[1][2]

Well History

Date Event
1994-05-04 Obtained License
1994-05-24 Surface Casing Operation Performed
1994-06-06 Well Log Performed
1994-06-20 Finished Drilling
1994-06-20 Well Log Performed
1994-06-23 Production Casing Operation Performed
1994-06-23 Rig Released
1994-06-23 Well Log Performed
1994-07-04 Well Log Performed
1994-07-05 Well Log Performed
1994-07-08 Perforation Treatment Performed - Jet Perforation
1994-07-08 Well Mode changed to Drilled and Cased
1994-07-10 Well Log Performed
1994-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-07-11 Plug Back Performed
1994-07-12 Perforation Treatment Performed - Jet Perforation
1994-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-07-14 Well Log Performed
1994-07-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-07-15 Plug Back Performed
1994-07-15 Well Log Performed
1994-07-16 Perforation Treatment Performed - Jet Perforation
1994-07-18 Perforation Treatment Performed - Visqueeze
1994-07-22 Well Began Production
1994-07-22 Well Fluid changed to Crude Oil
1994-07-22 Well Mode changed to Pumping
1995-03-06 Perforation Treatment Performed - Jet Perforation
1995-03-06 Well Log Performed
1995-03-07 Perforation Treatment Performed - Cement Squeeze
1995-03-11 Well Log Performed
1995-03-12 Perforation Treatment Performed - Acid Wash - No Pressure
1995-03-12 Perforation Treatment Performed - Jet Perforation
1996-05-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-18 Plug Back Performed
1996-05-18 Well Fluid changed to Crude Oil
1996-05-18 Well Log Performed
1996-05-18 Well Mode changed to Abandoned and Whipstocked
1996-05-24 Well Log Performed
1996-06-20 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-07-08 Perforation 2786.50 2789.00 13
1995-03-06 Perforation 2235.00 2236.00 13
1995-03-07 Cement Squeeze 2224.00 2236.00 0
1995-03-12 Perforation 2229.50 2233.00 13
1995-03-12 Acid Wash 2229.50 2233.00 0
1996-05-18 Packing Device Capped w/Cement 2212.00 2220.00 0
1994-07-08 Perforation 2796.00 2798.50 13
1994-07-11 Packing Device Capped w/Cement 2772.00 2780.00 0
1994-07-12 Perforation 2445.50 2448.00 13
1994-07-12 Perforation 2450.00 2454.50 13
1994-07-13 Acid Treatment 2445.50 2454.50 0
1994-07-15 Packing Device Capped w/Cement 2432.00 2440.00 0
1994-07-16 Perforation 2224.00 2228.00 13
1994-07-18 Visqueeze 2224.00 2228.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 2869 0.0 0.0 0.0
1995 7657 0.0 0.0 0.0
1996 3260 0.0 0.0 0.0

For data sources see[5]

References