X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385031604000

Well Details

Well ID: 0385031604000
Loading map...
Location: 00/04-16-038-03W5/0
Location Alias: 00/04-16-38-03 W5M
Location Alias 2: 00/04-16-038-03 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 16
County/Municipality: Red Deer County
Well Name: NAL SYLVAN LAKE 4-16-38-3
Operator Name: NAL Resources Limited
License Number: 0024737
License Date: 1963-08-27
License Status: Issued
Spud Date: 1963-08-27
Final Drill Date: 1963-09-12
Well Total Depth: 2298.80 m
Surface Hole Latitude: 52.262765
Surface Hole Longitude: -114.379208

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-08-27 Obtained License
1963-09-12 Finished Drilling
1963-09-12 Well Mode changed to Drilled and Cased
1963-09-14 Drill Stem Test Performed
1963-09-15 Production Casing Operation Performed
1963-09-16 Perforation Treatment Performed - Acid Wash - No Pressure
1963-09-16 Perforation Treatment Performed - Jet Perforation
1963-09-18 Well Began Production
1963-09-18 Well Fluid changed to Crude Oil
1963-09-18 Well Mode changed to Flowing
1971-11-07 Well Fluid changed to Crude Oil
1971-11-07 Well Mode changed to Pumping
1987-03-03 Perforation Treatment Performed - Jet Perforation
1987-03-03 Well Log Performed
1987-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-09-21 Perforation Treatment Performed - Jet Perforation
1993-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-21 Well Log Performed
2001-09-21 Perforation Treatment Performed - Bridge Plug No Cement Required
2001-09-21 Perforation Treatment Performed - Jet Perforation
2001-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-09-16 Perforation 2239.70 2241.50 7
1963-09-16 Acid Wash 2239.70 2241.50 0
1987-03-03 Perforation 2236.60 2241.50 13
1987-03-04 Acid Treatment 2236.60 2241.50 0
1993-09-21 Perforation 2242.70 2246.40 13
1993-09-22 Acid Treatment 2236.60 2246.40 0
2001-09-21 Bridge Plug, No Cement 2242.00 2242.10 0
2001-09-21 Perforation 2233.40 2235.40 20
2001-09-25 Acid Treatment 2233.40 2235.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7432 0.0 0.0 0.0
1968 7659 0.0 0.0 0.0
1969 8473 0.0 0.0 0.0
1970 7478 0.0 0.0 0.0
1971 6081 0.0 0.0 0.0
1972 8108 0.0 0.0 0.0
1973 8731 0.0 0.0 0.0
1974 8663 0.0 0.0 0.0
1975 8613 0.0 0.0 0.0
1976 8698 0.0 0.0 0.0
1977 8724 0.0 0.0 0.0
1978 8413 0.0 0.0 0.0
1979 8707 0.0 0.0 0.0
1980 8760 0.0 0.0 0.0
1981 7766 0.0 0.0 0.0
1982 8682 0.0 0.0 0.0
1983 8733 0.0 0.0 0.0
1984 8754 0.0 0.0 0.0
1985 8667 0.0 0.0 0.0
1986 8590 0.0 0.0 0.0
1987 7697 0.0 0.0 0.0
1988 8453 0.0 0.0 0.0
1989 8586 0.0 0.0 0.0
1990 8514 0.0 0.0 0.0
1991 8662 0.0 0.0 0.0
1992 8324 0.0 0.0 0.0
1993 8440 0.0 0.0 0.0
1994 8604 0.0 0.0 0.0
1995 8554 0.0 0.0 0.0
1996 8118 0.0 0.0 0.0
1997 8159 0.0 0.0 0.0
1998 8281 0.0 0.0 0.0
1999 8657 0.0 0.0 0.0
2000 8505 0.0 0.0 0.0
2001 8498 0.0 0.0 0.0
2002 8505 0.0 0.0 0.0
2003 8566 0.0 0.0 0.0
2004 8404 0.0 0.0 0.0
2005 8569 0.0 0.0 0.0
2006 8503 0.0 0.0 0.0
2007 8740 0.0 0.0 0.0
2008 8773 0.0 0.0 0.0
2009 8747 0.0 0.0 0.0
2010 8729 0.0 0.0 0.0
2011 8719 0.0 0.0 0.0
2012 8736 0.0 0.0 0.0
2013 8720 0.0 0.0 0.0
2014 8740 0.0 0.0 0.0
2015 8591 0.0 0.0 0.0
2016 8576 0.0 0.0 0.0
2017 8331 0.0 0.0 0.0
2018 8648 0.0 0.0 0.0
2019 8684 0.0 0.0 0.0
2020 2054 0.0 0.0 0.0

For data sources see[5]

References