X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385031606042

Well Details

Well ID: 0385031606042
Loading map...
Location: 04/06-16-038-03W5/2
Location Alias: 04/06-16-38-03 W5M
Location Alias 2: 04/06-16-038-03 W5/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 16
County/Municipality: Red Deer County
Well Name: NAL SYLAKE 6-16-38-3
Operator Name: NAL Resources Limited
License Number: 0171060
License Date: 1994-10-12
License Status: Amended
Spud Date: 1994-10-12
Final Drill Date: 1996-03-16
Well Total Depth: 2555.00 m
Surface Hole Latitude: 52.266318
Surface Hole Longitude: -114.367314

For data sources see[1][2]

Well History

Date Event
1994-10-12 Obtained License
1996-02-17 Well Log Performed
1996-03-03 Well Log Performed
1996-03-07 Direction Drilling Operation Performed - Horizontal
1996-03-15 Liner Casing Operation Performed
1996-03-16 Finished Drilling
1996-03-16 Perforation Treatment Performed - Open-Hole Completion
1996-03-16 Well Log Performed
1996-03-16 Well Mode changed to Drilled and Cased
1996-03-18 Well Began Production
1996-03-18 Well Fluid changed to Crude Oil
1996-03-18 Well Mode changed to Pumping
1996-03-20 Rig Released
1996-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-07-21 Well Log Performed
2000-06-12 Well Log Performed
2000-09-01 Well Fluid changed to Crude Oil
2000-09-01 Well Mode changed to Suspended
2007-10-01 Well Fluid changed to Crude Oil
2007-10-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-03-07 2182.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-03-16 Open Hole/Barefoot Completion 2228.80 2555.00 0
1996-04-07 Acid Treatment 2228.80 2555.00 0
1996-05-08 Acid Treatment 2228.80 2555.00 0
1997-02-15 Acid Treatment 2228.80 2555.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 6458 0.0 0.0 0.0
1997 4514 0.0 0.0 0.0
1998 6970 0.0 0.0 0.0
1999 8405 0.0 0.0 0.0
2000 5008 0.0 0.0 0.0
2007 323 0.0 0.0 0.0
2008 5747 0.0 0.0 0.0
2009 8281 0.0 0.0 0.0
2010 8643 0.0 0.0 0.0
2011 8478 0.0 0.0 0.0
2012 8561 0.0 0.0 0.0
2013 8516 0.0 0.0 0.0
2014 8645 0.0 0.0 0.0
2015 8547 0.0 0.0 0.0
2016 8131 0.0 0.0 0.0
2017 8158 0.0 0.0 0.0
2018 8487 0.0 0.0 0.0
2019 8379 0.0 0.0 0.0
2020 1998 0.0 0.0 0.0

For data sources see[6]

References