X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385031608000

Well Details

Well ID: 0385031608000
Loading map...
Location: 00/08-16-038-03W5/0
Location Alias: 00/08-16-38-03 W5M
Location Alias 2: 00/08-16-038-03 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 16
County/Municipality: Red Deer County
Well Name: NAL SYLAKE 8-16-38-3
Operator Name: NAL Resources Limited
License Number: 0058854
License Date: 1976-06-24
License Status: Issued
Spud Date: 1976-07-23
Final Drill Date: 1976-08-07
Well Total Depth: 2262.80 m
Surface Hole Latitude: 52.266834
Surface Hole Longitude: -114.361046

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-06-24 Obtained License
1976-07-23 Lost Circulation Occurred
1976-08-07 Finished Drilling
1976-08-07 Well Mode changed to Drilled and Cased
1976-08-11 Production Casing Operation Performed
1976-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-21 Perforation Treatment Performed - Jet Perforation
1976-09-23 Well Began Production
1976-09-23 Well Fluid changed to Crude Oil
1976-09-23 Well Mode changed to Pumping
1993-06-10 Perforation Treatment Performed - Jet Perforation
1993-06-10 Well Log Performed
1993-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-01-09 Perforation Treatment Performed - Jet Perforation
1996-01-09 Well Log Performed
1996-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-01-12 Perforation Treatment Performed - Jet Perforation
1996-01-12 Well Log Performed
1996-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-11-12 Perforation Treatment Performed - Jet Perforation
1996-11-12 Well Log Performed
1996-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-11-14 Perforation Treatment Performed - Chemical Squeeze
1996-12-02 Perforation Treatment Performed - Jet Perforation
1996-12-03 Perforation Treatment Performed - Cement Squeeze
1996-12-03 Well Log Performed
1996-12-05 Perforation Treatment Performed - Jet Perforation
1996-12-05 Well Log Performed
1996-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-12-22 Well Log Performed
1997-01-11 Perforation Treatment Performed - Cement Squeeze
1997-01-11 Well Log Performed
1997-01-14 Perforation Treatment Performed - Cement Squeeze
1997-01-16 Perforation Treatment Performed - Cement Squeeze
1997-04-04 Perforation Treatment Performed - Cement Squeeze
1997-04-06 Perforation Treatment Performed - Jet Perforation
1997-04-06 Well Log Performed
1997-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-10-10 Perforation Treatment Performed - Jet Perforation
2007-10-10 Well Log Performed
2007-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-02-01 Well Fluid changed to Crude Oil
2009-02-01 Well Mode changed to Suspended
2018-12-21 Well Fluid changed to Crude Oil
2018-12-21 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-09-21 Perforation 2230.80 2232.40 13
1996-11-13 Acid Treatment 2214.70 2233.00 0
1996-11-14 Chemical Squeeze 2214.70 2233.00 0
1996-12-02 Perforation 2210.50 2211.50 14
1996-12-03 Cement Squeeze 2229.00 2234.20 0
1996-12-05 Perforation 2215.90 2217.10 13
1996-12-05 Perforation 2220.20 2226.20 13
1996-12-06 Acid Treatment 2215.90 2226.20 0
1996-12-08 Acid Treatment 2215.90 2226.20 0
1997-01-11 Cement Squeeze 2210.50 2211.50 0
1997-01-14 Cement Squeeze 2210.50 2211.50 0
1976-09-21 Acid Treatment 2230.80 2232.40 0
1997-01-16 Cement Squeeze 2220.20 2226.20 0
1997-04-04 Cement Squeeze 2215.90 2217.10 0
1997-04-06 Perforation 2220.20 2226.30 14
1997-04-07 Acid Treatment 2220.20 2226.30 0
2007-10-10 Perforation 2220.30 2226.30 17
2007-10-13 Acid Treatment 2220.30 2226.30 0
1993-06-10 Perforation 2229.00 2232.40 14
1993-06-11 Acid Treatment 2229.00 2232.40 0
1996-01-09 Perforation 2229.00 2233.00 13
1996-01-11 Acid Treatment 2229.00 2233.00 0
1996-01-12 Perforation 2220.20 2226.20 13
1996-01-14 Acid Treatment 2220.20 2226.20 0
1996-11-12 Perforation 2214.70 2218.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 2085 0.0 0.0 0.0
1977 8631 0.0 0.0 0.0
1978 8646 0.0 0.0 0.0
1979 8462 0.0 0.0 0.0
1980 8626 0.0 0.0 0.0
1981 7427 0.0 0.0 0.0
1982 7902 0.0 0.0 0.0
1983 8693 0.0 0.0 0.0
1984 8706 0.0 0.0 0.0
1985 8595 0.0 0.0 0.0
1986 8584 0.0 0.0 0.0
1987 8458 0.0 0.0 0.0
1988 8582 0.0 0.0 0.0
1989 7179 0.0 0.0 0.0
1990 6851 0.0 0.0 0.0
1991 7081 0.0 0.0 0.0
1992 8534 0.0 0.0 0.0
1993 8069 0.0 0.0 0.0
1994 7889 0.0 0.0 0.0
1995 8457 0.0 0.0 0.0
1996 7667 0.0 0.0 0.0
1997 8079 0.0 0.0 0.0
1998 8390 0.0 0.0 0.0
1999 7894 0.0 0.0 0.0
2000 8716 0.0 0.0 0.0
2001 8412 0.0 0.0 0.0
2002 8710 0.0 0.0 0.0
2003 8295 0.0 0.0 0.0
2004 8679 0.0 0.0 0.0
2005 8675 0.0 0.0 0.0
2006 8677 0.0 0.0 0.0
2007 8317 0.0 0.0 0.0
2008 1305 0.0 0.0 0.0
2018 240 0.0 0.0 0.0
2019 8428 0.0 0.0 0.0
2020 2160 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1976-07-23 Lost Circulation 18.30 55.00

For data sources see[6]

References