X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385031610000

Well Details

Well ID: 0385031610000
Loading map...
Location: 00/10-16-038-03W5/0
Location Alias: 00/10-16-38-03 W5M
Location Alias 2: 00/10-16-038-03 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 16
County/Municipality: Red Deer County
Well Name: NAL SYLVAN LAKE 10-16-38-3
Operator Name: NAL Resources Limited
License Number: 0024096
License Date: 1963-05-03
License Status: Suspension
Spud Date: 1963-05-07
Final Drill Date: 1963-06-05
Well Total Depth: 2277.50 m
Surface Hole Latitude: 52.270197
Surface Hole Longitude: -114.367662

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-05-03 Obtained License
1963-05-26 Drill Stem Test Performed
1963-06-02 Drill Stem Test Performed
1963-06-05 Finished Drilling
1963-06-05 Well Mode changed to Drilled and Cased
1963-06-06 Drill Stem Test Performed
1963-06-07 Production Casing Operation Performed
1963-06-08 Perforation Treatment Performed - Acid Wash - No Pressure
1963-06-08 Perforation Treatment Performed - Jet Perforation
1963-06-12 Well Began Production
1963-06-12 Well Fluid changed to Crude Oil
1963-06-12 Well Mode changed to Flowing
1972-05-01 Well Fluid changed to Crude Oil
1972-05-01 Well Mode changed to Pumping
1992-04-29 Perforation Treatment Performed - Jet Perforation
1992-04-29 Well Log Performed
1992-04-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-31 Perforation Treatment Performed - Jet Perforation
1994-05-31 Well Log Performed
1994-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-26 Well Log Performed
1996-10-27 Perforation Treatment Performed - Cement Squeeze
1996-10-28 Well Log Performed
1996-10-29 Perforation Treatment Performed - Jet Perforation
1996-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-11-01 Perforation Treatment Performed - Chemical Squeeze
1998-01-16 Perforation Treatment Performed - Jet Perforation
1998-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-12-13 Perforation Treatment Performed - Cement Squeeze
2001-12-14 Perforation Treatment Performed - Jet Perforation
2001-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-04-01 Well Fluid changed to Crude Oil
2012-04-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-06-08 Perforation 2229.30 2231.10 7
1996-11-01 Chemical Squeeze 2221.50 2228.00 0
1998-01-16 Perforation 2229.00 2230.50 13
1998-01-16 Perforation 2232.40 2234.80 13
1998-01-17 Acid Treatment 2229.00 2234.80 0
2001-12-13 Cement Squeeze 2221.50 2234.80 0
2001-12-14 Perforation 2216.50 2218.50 20
2001-12-14 Perforation 2210.90 2215.40 20
2001-12-15 Acid Treatment 2216.50 2218.50 0
2001-12-15 Acid Treatment 2210.90 2215.40 0
1963-06-08 Acid Wash 2229.30 2231.10 0
1992-04-29 Perforation 2227.00 2230.10 20
1992-04-30 Acid Treatment 2227.00 2231.10 0
1994-05-31 Perforation 2224.40 2228.10 13
1994-06-01 Acid Treatment 2224.40 2231.10 0
1996-10-27 Cement Squeeze 2227.10 2231.10 0
1996-10-29 Perforation 2221.50 2228.00 13
1996-10-31 Acid Treatment 2221.50 2228.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1793 0.0 0.0 0.0
1968 1284 0.0 0.0 0.0
1969 1736 0.0 0.0 0.0
1970 5090 0.0 0.0 0.0
1971 8735 0.0 0.0 0.0
1972 7348 0.0 0.0 0.0
1973 8105 0.0 0.0 0.0
1974 8687 0.0 0.0 0.0
1975 8537 0.0 0.0 0.0
1976 8515 0.0 0.0 0.0
1977 8692 0.0 0.0 0.0
1978 8279 0.0 0.0 0.0
1979 8527 0.0 0.0 0.0
1980 8548 0.0 0.0 0.0
1981 7504 0.0 0.0 0.0
1982 8086 0.0 0.0 0.0
1983 8681 0.0 0.0 0.0
1984 8526 0.0 0.0 0.0
1985 7997 0.0 0.0 0.0
1986 8671 0.0 0.0 0.0
1987 8588 0.0 0.0 0.0
1988 8265 0.0 0.0 0.0
1989 8308 0.0 0.0 0.0
1990 8527 0.0 0.0 0.0
1991 8286 0.0 0.0 0.0
1992 8171 0.0 0.0 0.0
1993 8468 0.0 0.0 0.0
1994 8170 0.0 0.0 0.0
1995 8548 0.0 0.0 0.0
1996 8417 0.0 0.0 0.0
1997 8610 0.0 0.0 0.0
1998 7799 0.0 0.0 0.0
1999 8067 0.0 0.0 0.0
2000 4568 0.0 0.0 0.0
2001 729 0.0 0.0 0.0
2002 8196 0.0 0.0 0.0
2003 8540 0.0 0.0 0.0
2004 8587 0.0 0.0 0.0
2005 8692 0.0 0.0 0.0
2006 8319 0.0 0.0 0.0
2007 8658 0.0 0.0 0.0
2008 8588 0.0 0.0 0.0
2009 8678 0.0 0.0 0.0
2010 8039 0.0 0.0 0.0
2011 1536 0.0 0.0 0.0

For data sources see[5]

References