X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385031614000

Well Details

Well ID: 0385031614000
Loading map...
Location: 00/14-16-038-03W5/0
Location Alias: 00/14-16-38-03 W5M
Location Alias 2: 00/14-16-038-03 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 16
County/Municipality: Red Deer County
Well Name: NAL SYLAKE 14-16-38-3
Operator Name: NAL Resources Limited
License Number: 0058853
License Date: 1976-06-24
License Status: Issued
Spud Date: 1976-08-13
Final Drill Date: 1976-08-27
Well Total Depth: 2274.10 m
Surface Hole Latitude: 52.273307
Surface Hole Longitude: -114.372899

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-06-24 Obtained License
1976-08-27 Finished Drilling
1976-08-27 Well Mode changed to Drilled and Cased
1976-08-29 Production Casing Operation Performed
1976-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-27 Perforation Treatment Performed - Jet Perforation
1976-09-29 Well Began Production
1976-09-29 Well Fluid changed to Crude Oil
1976-09-29 Well Mode changed to Pumping
1992-06-03 Well Log Performed
1994-01-04 Perforation Treatment Performed - Jet Perforation
1994-01-04 Well Log Performed
1994-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-05-17 Well Log Performed
1995-05-19 Perforation Treatment Performed - Cement Squeeze
1995-05-21 Well Log Performed
1995-05-22 Perforation Treatment Performed - Jet Perforation
1995-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-01-04 Well Log Performed
1996-01-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-01-05 Plug Back Performed
1996-01-05 Well Fluid changed to Crude Oil
1996-01-05 Well Mode changed to Abandoned and Whipstocked
1996-01-09 Well Log Performed
1996-02-03 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-09-27 Perforation 2229.90 2231.40 13
1976-09-27 Acid Treatment 2229.90 2231.40 0
1994-01-04 Perforation 2227.20 2228.70 13
1994-01-06 Acid Treatment 2227.20 2231.40 0
1995-05-19 Cement Squeeze 2227.20 2231.40 0
1995-05-22 Perforation 2221.40 2225.60 13
1995-05-23 Acid Treatment 2221.40 2225.60 0
1996-01-05 Packing Device Capped w/Cement 2204.00 2212.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 2024 0.0 0.0 0.0
1977 7360 0.0 0.0 0.0
1978 8475 0.0 0.0 0.0
1979 8533 0.0 0.0 0.0
1980 8603 0.0 0.0 0.0
1981 7400 0.0 0.0 0.0
1982 8490 0.0 0.0 0.0
1983 8549 0.0 0.0 0.0
1984 8754 0.0 0.0 0.0
1985 8539 0.0 0.0 0.0
1986 8548 0.0 0.0 0.0
1987 8371 0.0 0.0 0.0
1988 8013 0.0 0.0 0.0
1989 7054 0.0 0.0 0.0
1990 7971 0.0 0.0 0.0
1991 7936 0.0 0.0 0.0
1992 7681 0.0 0.0 0.0
1993 7844 0.0 0.0 0.0
1994 6975 0.0 0.0 0.0
1995 7788 0.0 0.0 0.0
1996 24 0.0 0.0 0.0

For data sources see[5]

References