X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385031814002

Well Details

Well ID: 0385031814002
Loading map...
Location: 00/14-18-038-03W5/2
Location Alias: 00/14-18-38-03 W5M
Location Alias 2: 00/14-18-038-03 W5/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 18
County/Municipality: Red Deer County
Well Name: RESPONSE SYLAKE 14-18-38-3
Operator Name: Response Energy Corporation
License Number: 0126425
License Date: 1987-05-11
License Status: Suspension
Spud Date: 1987-05-29
Final Drill Date: 1987-06-15
Well Total Depth: 2335.00 m
Surface Hole Latitude: 52.272156
Surface Hole Longitude: -114.419217

For data sources see[1][2]

Well History

Date Event
1987-05-11 Obtained License
1987-05-30 Surface Casing Operation Performed
1987-06-06 Kick Occurred
1987-06-15 Finished Drilling
1987-06-15 Well Mode changed to Drilled and Cased
1987-06-16 Well Log Performed
1987-06-17 Drill Stem Test Performed
1987-06-18 Drill Stem Test Performed
1987-06-21 Production Casing Operation Performed
1987-06-21 Rig Released
1987-07-16 Well Log Performed
1987-07-18 Perforation Treatment Performed - Jet Perforation
1987-07-19 Perforation Treatment Performed - Acid Wash - No Pressure
1987-07-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-07-20 Plug Back Performed
1987-07-20 Well Log Performed
1987-07-21 Well Log Performed
1987-07-22 Perforation Treatment Performed - Jet Perforation
1987-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-07-27 Perforation Treatment Performed - Fractured
1989-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-03-01 Plug Back Performed
1989-03-03 Perforation Treatment Performed - Jet Perforation
1989-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-03-07 Plug Back Performed
1989-03-08 Perforation Treatment Performed - Jet Perforation
1989-03-09 Well Began Production
1989-03-09 Well Fluid changed to Crude Oil
1989-03-09 Well Mode changed to Flowing
1991-08-12 Well Fluid changed to Crude Oil
1991-08-12 Well Mode changed to Pumping
1992-02-11 Perforation Treatment Performed - Jet Perforation
1992-02-11 Well Log Performed
1992-02-12 Perforation Treatment Performed - Jet Perforation
2010-10-31 Well Fluid changed to Crude Oil
2010-10-31 Well Mode changed to Suspended
2019-12-01 Well Fluid changed to Crude Oil
2019-12-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-07-18 Perforation 2288.50 2292.00 13
1989-03-08 Perforation 1870.00 1875.00 13
1992-02-11 Perforation 1890.00 1906.00 13
1992-02-11 Perforation 1916.00 1928.00 13
1992-02-11 Perforation 1974.00 1980.00 13
1992-02-12 Perforation 1852.00 1880.00 13
1987-07-19 Acid Wash 2288.50 2292.00 0
1987-07-20 Packing Device Capped w/Cement 2278.00 2286.00 0
1987-07-22 Perforation 2261.50 2264.00 13
1987-07-25 Acid Treatment 2261.50 2264.00 0
1987-07-27 Fracture 2261.50 2264.00 0
1989-03-01 Packing Device Capped w/Cement 2235.00 2245.00 0
1989-03-03 Perforation 2188.50 2191.50 13
1989-03-07 Packing Device Capped w/Cement 2165.00 2184.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 4167 0.0 0.0 0.0
1990 6462 0.0 0.0 0.0
1991 7787 0.0 0.0 0.0
1992 8318 0.0 0.0 0.0
1993 8445 0.0 0.0 0.0
1994 7989 0.0 0.0 0.0
1995 8558 0.0 0.0 0.0
1996 8644 0.0 0.0 0.0
1997 8568 0.0 0.0 0.0
1998 8747 0.0 0.0 0.0
1999 8200 0.0 0.0 0.0
2000 8769 0.0 0.0 0.0
2001 8701 0.0 0.0 0.0
2002 8607 0.0 0.0 0.0
2003 8552 0.0 0.0 0.0
2004 8529 0.0 0.0 0.0
2005 8697 0.0 0.0 0.0
2006 8628 0.0 0.0 0.0
2007 8385 0.0 0.0 0.0
2008 8585 0.0 0.0 0.0
2009 7735 0.0 0.0 0.0
2010 6776 0.0 0.0 0.0
2019 744 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1987-06-06 Kick 1873.00 1873.00

For data sources see[6]

References