X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385041310000

Well Details

Well ID: 0385041310000
Loading map...
Location: 00/10-13-038-04W5/0
Location Alias: 00/10-13-38-04 W5M
Location Alias 2: 00/10-13-038-04 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 04
Section: 13
County/Municipality: Clearwater County
Well Name: RESPONSE SYLAKE 10-13-38-4
Operator Name: Response Energy Corporation
License Number: 0023044
License Date: 1962-09-24
License Status: Suspension
Spud Date: 1962-09-25
Final Drill Date: 1962-10-19
Well Total Depth: 2366.80 m
Surface Hole Latitude: 52.269825
Surface Hole Longitude: -114.439060

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-09-24 Obtained License
1962-10-12 Drill Stem Test Performed
1962-10-14 Drill Stem Test Performed
1962-10-19 Finished Drilling
1962-10-20 Drill Stem Test Performed
1962-10-21 Drill Stem Test Performed
1962-10-22 Drill Stem Test Performed
1962-10-23 Production Casing Operation Performed
1962-11-14 Perforation Treatment Performed - Jet Perforation
1962-11-16 Perforation Treatment Performed - Acid Wash - No Pressure
1962-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-12-03 Well Mode changed to Drilled and Cased
1964-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-06-08 Perforation Treatment Performed - Fractured
1986-09-22 Well Fluid changed to Gas
1986-09-22 Well Mode changed to Testing
1986-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-09-23 Plug Back Performed
1986-09-23 Well Fluid changed to Gas
1986-09-23 Well Log Performed
1986-09-23 Well Mode changed to Abandoned Zone
1986-09-25 Well Log Performed
1986-09-26 Perforation Treatment Performed - Jet Perforation
2001-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-13 Plug Back Performed
2001-12-13 Well Log Performed
2002-01-04 Well Log Performed
2002-01-07 Well Log Performed
2008-11-06 Perforation Treatment Performed - Cement Plug
2008-11-06 Plug Back Performed
2008-11-09 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-11-14 Perforation 2295.40 2297.30 7
2008-11-06 Cement Plug 2113.80 2286.00 0
1962-11-14 Perforation 2300.90 2302.80 7
1962-11-16 Acid Wash 2295.40 2302.80 0
1962-11-17 Acid Treatment 2295.40 2302.80 0
1964-06-06 Acid Treatment 2295.40 2302.80 0
1964-06-08 Fracture 2295.40 2302.80 0
1986-09-23 Packing Device Capped w/Cement 2282.00 2290.00 0
1986-09-26 Perforation 2262.80 2267.70 13
2001-12-13 Packing Device Capped w/Cement 2241.80 2250.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1980 2767 0.0 0.0 0.0

For data sources see[5]

References