X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385042010000

Well Details

Well ID: 0385042010000
Loading map...
Location: 00/10-20-038-04W5/0
Location Alias: 00/10-20-38-04 W5M
Location Alias 2: 00/10-20-038-04 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 04
Section: 20
County/Municipality: Clearwater County
Well Name: NAL MEDRIV 10-20-38-4
Operator Name: NAL Resources Limited
License Number: 0030039
License Date: 1966-02-17
License Status: Suspension
Spud Date: 1966-02-26
Final Drill Date: 1966-03-18
Well Total Depth: 2362.80 m
Surface Hole Latitude: 52.284381
Surface Hole Longitude: -114.534313

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-02-17 Obtained License
1966-03-18 Finished Drilling
1966-03-18 Well Mode changed to Drilled and Cased
1966-03-20 Drill Stem Test Performed
1966-03-21 Drill Stem Test Performed
1966-03-22 Production Casing Operation Performed
1966-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-03-26 Perforation Treatment Performed - Acid Wash - No Pressure
1966-03-26 Perforation Treatment Performed - Fractured
1966-03-26 Perforation Treatment Performed - Jet Perforation
1966-06-20 Well Began Production
1966-06-20 Well Fluid changed to Crude Oil
1966-06-20 Well Mode changed to Pumping
1979-03-21 Well Began Injection
1979-03-21 Well Fluid changed to Water
1979-03-21 Well Type changed to Injection
1979-08-02 Perforation Treatment Performed - Chemical Squeeze
1979-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-04-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-11-01 Well Fluid changed to Water
2000-11-01 Well Mode changed to Suspended
2000-11-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-03-26 Perforation 2282.60 2284.50 13
1966-03-26 Acid Wash 2282.60 2284.50 0
1966-03-26 Acid Treatment 2282.60 2284.50 0
1966-03-26 Fracture 2282.60 2284.50 0
1979-08-02 Chemical Squeeze 2282.60 2284.50 0
1979-08-15 Acid Treatment 2282.60 2284.50 0
1983-04-19 Acid Treatment 2282.60 2284.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 7608 0.0 0.0 0.0
1968 7814 0.0 0.0 0.0
1969 7696 0.0 0.0 0.0
1970 7023 0.0 0.0 0.0
1971 7656 0.0 0.0 0.0
1972 7834 0.0 0.0 0.0
1973 7932 0.0 0.0 0.0
1974 7980 0.0 0.0 0.0
1975 7963 0.0 0.0 0.0
1976 7678 0.0 0.0 0.0
1977 7656 0.0 0.0 0.0
1978 8068 0.0 0.0 0.0
1979 936 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0

For data sources see[5]

References