X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385042802000

Well Details

Well ID: 0385042802000
Loading map...
Location: 00/02-28-038-04W5/0
Location Alias: 00/02-28-38-04 W5M
Location Alias 2: 00/02-28-038-04 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 04
Section: 28
County/Municipality: Clearwater County
Well Name: NAL MEDRIV 2-28-38-4
Operator Name: NAL Resources Limited
License Number: 0048832
License Date: 1974-01-31
License Status: Issued
Spud Date: 1974-02-22
Final Drill Date: 1974-03-14
Well Total Depth: 2347.00 m
Surface Hole Latitude: 52.291824
Surface Hole Longitude: -114.510438

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-01-31 Obtained License
1974-03-14 Finished Drilling
1974-03-14 Well Mode changed to Drilled and Cased
1974-03-18 Drill Stem Test Performed
1974-03-20 Production Casing Operation Performed
1974-06-24 Perforation Treatment Performed - Jet Perforation
1974-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-06-30 Well Began Production
1974-06-30 Well Fluid changed to Crude Oil
1974-06-30 Well Mode changed to Flowing
1974-07-03 Perforation Treatment Performed - Jet Perforation
1974-07-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-07-04 Perforation Treatment Performed - Acid Wash - No Pressure
1974-07-07 Well Fluid changed to Crude Oil
1974-07-07 Well Mode changed to Flowing
1975-06-19 Perforation Treatment Performed - Cement Squeeze
1975-07-15 Perforation Treatment Performed - Jet Perforation
1975-10-03 Perforation Treatment Performed - Jet Perforation
1975-10-04 Perforation Treatment Performed - Acid Wash - No Pressure
1975-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-10-16 Perforation Treatment Performed - Fractured
1978-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-06 Well Fluid changed to Crude Oil
1980-10-06 Well Mode changed to Flowing
1981-05-11 Perforation Treatment Performed - Chemical Squeeze
1986-05-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-04-06 Perforation Treatment Performed - Condensate Squeeze
1990-04-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-05-02 Well Fluid changed to Crude Oil
1990-05-02 Well Mode changed to Pumping
1991-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-08-18 Perforation Treatment Performed - Cement Squeeze
1991-08-18 Well Fluid changed to Crude Oil
1991-08-18 Well Mode changed to Pumping
1991-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-06-24 Perforation 2319.50 2323.80 3
1975-10-03 Perforation 2255.80 2258.90 7
1975-10-04 Acid Wash 2255.80 2258.90 0
1975-10-09 Acid Treatment 2255.80 2258.90 0
1975-10-16 Fracture 2255.80 2258.90 0
1978-12-12 Acid Treatment 2319.50 2323.80 0
1981-05-11 Chemical Squeeze 2319.50 2323.80 0
1986-05-29 Acid Treatment 2255.80 2258.90 0
1990-04-06 Condensate Squeeze 2319.50 2328.80 0
1990-04-30 Acid Treatment 2319.50 2328.80 0
1991-08-17 Acid Treatment 2255.80 2258.90 0
1974-06-28 Acid Treatment 2319.50 2323.80 0
1991-08-18 Cement Squeeze 2255.80 2258.90 0
1991-09-03 Acid Treatment 2319.50 2323.80 0
1993-09-21 Acid Treatment 2319.50 2323.80 0
1994-09-18 Acid Treatment 2319.50 2323.80 0
1974-06-28 Acid Treatment 2319.50 2323.80 0
1974-07-03 Perforation 2282.30 2283.60 7
1974-07-04 Acid Wash 2282.30 2283.60 0
1974-07-04 Acid Treatment 2282.30 2283.60 0
1974-07-04 Acid Treatment 2282.30 2283.60 0
1975-06-19 Cement Squeeze 2282.30 2283.60 0
1975-07-15 Perforation 2319.50 2323.80 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 356 0.0 0.0 0.0
1975 3704 0.0 0.0 0.0
1976 5503 0.0 0.0 0.0
1977 6874 0.0 0.0 0.0
1978 8139 0.0 0.0 0.0
1979 7190 0.0 0.0 0.0
1980 6252 0.0 0.0 0.0
1981 4614 0.0 0.0 0.0
1982 8288 0.0 0.0 0.0
1983 8129 0.0 0.0 0.0
1984 8209 0.0 0.0 0.0
1985 8727 0.0 0.0 0.0
1986 8363 0.0 0.0 0.0
1987 8394 0.0 0.0 0.0
1988 8058 0.0 0.0 0.0
1989 912 0.0 0.0 0.0
1990 5285 0.0 0.0 0.0
1991 7929 0.0 0.0 0.0
1992 8656 0.0 0.0 0.0
1993 8199 0.0 0.0 0.0
1994 7513 0.0 0.0 0.0
1995 7392 0.0 0.0 0.0
1996 8566 0.0 0.0 0.0
1997 8571 0.0 0.0 0.0
1998 7947 0.0 0.0 0.0
1999 8574 0.0 0.0 0.0
2000 8454 0.0 0.0 0.0
2001 8489 0.0 0.0 0.0
2002 8114 0.0 0.0 0.0
2003 7823 0.0 0.0 0.0
2004 8569 0.0 0.0 0.0
2005 8521 0.0 0.0 0.0
2006 8255 0.0 0.0 0.0
2007 8305 0.0 0.0 0.0
2008 8549 0.0 0.0 0.0
2009 8284 0.0 0.0 0.0
2010 8438 0.0 0.0 0.0
2011 8618 0.0 0.0 0.0
2012 6067 0.0 0.0 0.0
2013 6579 0.0 0.0 0.0
2014 8476 0.0 0.0 0.0
2015 8489 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8067 0.0 0.0 0.0
2018 8206 0.0 0.0 0.0
2019 8602 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[5]

References