X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385043502000

Well Details

Well ID: 0385043502000
Loading map...
Location: 00/02-35-038-04W5/0
Location Alias: 00/02-35-38-04 W5M
Location Alias 2: 00/02-35-038-04 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 04
Section: 35
County/Municipality: Clearwater County
Well Name: NALR MEDR 2-35-38-4
Operator Name: NAL Resources Limited
License Number: 0022088
License Date: 1962-02-09
License Status: Issued
Spud Date: 1962-02-10
Final Drill Date: 1962-03-09
Well Total Depth: 2289.00 m
Surface Hole Latitude: 52.306301
Surface Hole Longitude: -114.462859

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-02-09 Obtained License
1962-03-07 Drill Stem Test Performed
1962-03-09 Finished Drilling
1962-03-09 Production Casing Operation Performed
1962-03-10 Drill Stem Test Performed
1962-03-11 Drill Stem Test Performed
1962-03-12 Drill Stem Test Performed
1962-03-14 Perforation Treatment Performed - Jet Perforation
1962-06-25 Well Mode changed to Drilled and Cased
1962-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1962-07-10 Perforation Treatment Performed - Jet Perforation
1962-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-09-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1964-06-30 Perforation Treatment Performed - Jet Perforation
1964-07-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-05-03 Well Began Production
1965-05-03 Well Fluid changed to Gas
1965-05-03 Well Mode changed to Flowing
1965-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1965-09-14 Perforation Treatment Performed - Jet Perforation
1965-09-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-09-30 Perforation Treatment Performed - Acid Wash - No Pressure
1965-10-02 Perforation Treatment Performed - Jet Perforation
1965-10-03 Perforation Treatment Performed - Fractured
1966-03-02 Perforation Treatment Performed - Cement Squeeze
1966-03-02 Perforation Treatment Performed - Jet Perforation
1968-12-17 Well Fluid changed to Gas
1968-12-17 Well Mode changed to Suspended
1972-03-22 Well Fluid changed to Crude Oil
1972-03-22 Well Mode changed to Flowing
1975-11-27 Well Fluid changed to Crude Oil
1975-11-27 Well Mode changed to Suspended
1976-05-01 Well Fluid changed to Crude Oil
1976-05-01 Well Mode changed to Flowing
1977-07-25 Well Fluid changed to Crude Oil
1977-07-25 Well Mode changed to Pumping
1987-12-09 Perforation Treatment Performed - Acid Wash - No Pressure
1987-12-14 Perforation Treatment Performed - Acid Wash - No Pressure
1990-03-12 Perforation Treatment Performed - Jet Perforation
1990-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-08-24 Perforation Treatment Performed - Fractured
2001-09-03 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-03-14 Perforation 2247.60 2251.90 7
1965-09-14 Perforation 2198.20 2200.70 0
1965-09-15 Acid Treatment 2198.20 2200.70 0
1965-09-30 Acid Wash 2198.20 2200.70 0
1965-10-02 Perforation 2198.20 2200.70 0
1965-10-03 Fracture 2198.20 2200.70 0
1966-03-02 Cement Squeeze 2198.20 2200.70 0
1966-03-02 Perforation 2215.00 2216.20 7
1966-03-02 Perforation 2218.60 2219.90 7
1987-12-09 Acid Wash 2215.00 2219.00 0
1987-12-14 Acid Wash 2215.00 2219.00 0
1962-07-10 Packing Device Capped w/Cement 2245.80 2245.80 0
1990-03-12 Perforation 2209.80 2219.90 16
1990-03-12 Perforation 2221.10 2222.90 16
1990-03-13 Acid Treatment 2209.80 2222.90 0
1991-10-03 Acid Treatment 2209.80 2222.90 0
2001-08-24 Fracture 2209.80 2217.00 0
2001-09-03 Perforation 2196.40 2203.40 17
1962-07-10 Perforation 2242.10 2243.30 0
1962-07-11 Acid Treatment 2242.10 2243.30 0
1962-09-04 Packing Device Capped w/Cement 2236.60 2236.60 0
1964-06-30 Perforation 2215.00 2216.20 7
1964-06-30 Perforation 2218.60 2219.90 7
1964-07-01 Acid Treatment 2218.60 2219.90 0
1965-09-13 Packing Device Capped w/Cement 2208.30 2208.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1971 827 0.0 0.0 0.0
1972 2472 0.0 0.0 0.0
1973 2702 0.0 0.0 0.0
1975 1 0.0 0.0 0.0
1976 4635 0.0 0.0 0.0
1977 6207 0.0 0.0 0.0
1978 7996 0.0 0.0 0.0
1979 7644 0.0 0.0 0.0
1980 7644 0.0 0.0 0.0
1981 7561 0.0 0.0 0.0
1982 6591 0.0 0.0 0.0
1983 8109 0.0 0.0 0.0
1984 7609 0.0 0.0 0.0
1985 7312 0.0 0.0 0.0
1986 8152 0.0 0.0 0.0
1987 8240 0.0 0.0 0.0
1988 7868 0.0 0.0 0.0
1989 7582 0.0 0.0 0.0
1990 7853 0.0 0.0 0.0
1991 7520 0.0 0.0 0.0
1992 8583 0.0 0.0 0.0
1993 8360 0.0 0.0 0.0
1994 8549 0.0 0.0 0.0
1995 8715 0.0 0.0 0.0
1996 8741 0.0 0.0 0.0
1997 8683 0.0 0.0 0.0
1998 8624 0.0 0.0 0.0
1999 8197 0.0 0.0 0.0
2000 8627 0.0 0.0 0.0
2001 8586 0.0 0.0 0.0
2002 8561 0.0 0.0 0.0
2003 8661 0.0 0.0 0.0
2004 8767 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8755 0.0 0.0 0.0
2007 8480 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8754 0.0 0.0 0.0
2010 8653 0.0 0.0 0.0
2011 8668 0.0 0.0 0.0
2012 8751 0.0 0.0 0.0
2013 8735 0.0 0.0 0.0
2014 8606 0.0 0.0 0.0
2015 8441 0.0 0.0 0.0
2016 8602 0.0 0.0 0.0
2017 8397 0.0 0.0 0.0
2018 8478 0.0 0.0 0.0
2019 8582 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[5]

References