If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0385061015002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.260278,"lon":-114.774291,"icon":""}]} |
| Location: 00/15-10-038-06W5/2 | |
| Location Alias: 00/15-10-38-06 W5M | |
| Location Alias 2: 00/15-10-038-06 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 038 | |
| Meridian: 5 | |
| Range: 06 | |
| Section: 10 | |
| County/Municipality: Clearwater County | |
| Well Name: NOVUS WILLGR 15-10-38-6 | |
| Operator Name: Novus Energy Inc. | |
| License Number: 0299148 | |
| License Date: 2003-12-16 | |
| License Status: Abandoned | |
| Spud Date: 2003-12-27 | |
| Final Drill Date: 2003-12-30 | |
| Well Total Depth: 818.00 m | |
| Surface Hole Latitude: 52.260278 | |
| Surface Hole Longitude: -114.774291 |
| Date | Event |
|---|---|
| 2003-12-16 | Obtained License |
| 2003-12-27 | Surface Casing Operation Performed |
| 2003-12-30 | Finished Drilling |
| 2003-12-30 | Production Casing Operation Performed |
| 2003-12-30 | Well Log Performed |
| 2003-12-30 | Well Mode changed to Drilled and Cased |
| 2003-12-31 | Rig Released |
| 2004-02-26 | Perforation Treatment Performed - Jet Perforation |
| 2004-03-03 | Perforation Treatment Performed - Fractured |
| 2004-03-08 | Perforation Treatment Performed - Jet Perforation |
| 2004-03-12 | Perforation Treatment Performed - Fractured |
| 2004-03-21 | Perforation Treatment Performed - Jet Perforation |
| 2004-06-01 | Perforation Treatment Performed - Cement Squeeze |
| 2004-06-05 | Perforation Treatment Performed - Jet Perforation |
| 2004-06-09 | Perforation Treatment Performed - Fractured |
| 2017-06-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2017-06-24 | Plug Back Performed |
| 2017-06-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2017-06-25 | Perforation Treatment Performed - Jet Perforation |
| 2017-06-25 | Perforation Treatment Performed - Remedial Casing |
| 2017-06-25 | Plug Back Performed |
| 2017-06-25 | Well Log Performed |
| 2017-06-25 | Well Mode changed to Abandoned Zone |
| 2017-06-30 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2004-02-26 | Perforation | 766.00 | 767.50 | 17 |
| 2004-06-05 | Perforation | 640.00 | 642.00 | 17 |
| 2004-06-05 | Perforation | 632.00 | 633.00 | 17 |
| 2004-06-05 | Perforation | 612.00 | 613.50 | 17 |
| 2004-06-05 | Perforation | 596.00 | 597.50 | 17 |
| 2004-06-05 | Perforation | 577.00 | 579.50 | 17 |
| 2004-06-09 | Fracture | 577.00 | 667.00 | 0 |
| 2017-06-24 | Packing Device Capped w/Cement | 695.00 | 705.00 | 0 |
| 2017-06-25 | Perforation | 559.00 | 563.00 | 17 |
| 2017-06-25 | Remedial Casing Cementing | 559.00 | 563.00 | 0 |
| 2017-06-25 | Packing Device Capped w/Cement | 562.00 | 572.00 | 0 |
| 2004-03-03 | Fracture | 766.00 | 767.50 | 0 |
| 2017-06-25 | Packing Device Capped w/Cement | 545.00 | 555.00 | 0 |
| 2004-03-08 | Perforation | 748.00 | 751.50 | 17 |
| 2004-03-08 | Perforation | 732.50 | 735.50 | 17 |
| 2004-03-08 | Perforation | 710.00 | 712.00 | 17 |
| 2004-03-12 | Fracture | 710.00 | 751.50 | 0 |
| 2004-03-21 | Perforation | 559.00 | 563.00 | 17 |
| 2004-06-01 | Cement Squeeze | 559.00 | 563.00 | 0 |
| 2004-06-05 | Perforation | 665.00 | 667.00 | 17 |
For data sources see[4]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-06-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]