If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0385081113000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.24708,"lon":-115.04299,"icon":""}]} |
| Location: 00/13-11-038-08W5/0 | |
| Location Alias: 00/13-11-38-08 W5M | |
| Location Alias 2: 00/13-11-038-08 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 038 | |
| Meridian: 5 | |
| Range: 08 | |
| Section: 11 | |
| County/Municipality: Clearwater County | |
| Well Name: YANGARRA HZ FERRIER 13-11-38-8 | |
| Operator Name: Yangarra Resources Corp. | |
| License Number: 0454355 | |
| License Date: 2013-01-30 | |
| License Status: Issued | |
| Spud Date: 2013-02-03 | |
| Final Drill Date: 2013-02-18 | |
| Well Total Depth: 3644.00 m | |
| Surface Hole Latitude: 52.247080 | |
| Surface Hole Longitude: -115.042990 |
| Date | Event |
|---|---|
| 2013-01-30 | Obtained License |
| 2013-02-07 | Surface Casing Operation Performed |
| 2013-02-10 | Well Log Performed |
| 2013-02-12 | Direction Drilling Operation Performed - Deviate |
| 2013-02-13 | Direction Drilling Operation Performed - Horizontal |
| 2013-02-18 | Finished Drilling |
| 2013-02-18 | Well Log Performed |
| 2013-02-18 | Well Mode changed to Drilled and Cased |
| 2013-02-19 | Perforation Treatment Performed - Open-Hole Completion |
| 2013-02-19 | Production Casing Operation Performed |
| 2013-02-19 | Well Log Performed |
| 2013-02-20 | Rig Released |
| 2013-03-19 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-04-22 | Well Began Production |
| 2013-04-22 | Well Fluid changed to Crude Oil |
| 2013-04-22 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2013-02-03 | Trinidad Drilling Ltd. | 53 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2013-02-12 | 2016.40 | Deviate (5 - 79 degrees) |
| 2013-02-13 | 2476.90 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2013-02-19 | Open Hole/Barefoot Completion | 3639.00 | 3644.00 | 0 |
| 2013-03-19 | Multi-Stage Fracture | 3112.40 | 3112.90 | 0 |
| 2013-03-19 | Multi-Stage Fracture | 3053.70 | 3054.20 | 0 |
| 2013-03-19 | Multi-Stage Fracture | 2995.00 | 2995.60 | 0 |
| 2013-03-19 | Multi-Stage Fracture | 2936.50 | 2937.00 | 0 |
| 2013-03-19 | Multi-Stage Fracture | 2877.60 | 2878.10 | 0 |
| 2013-03-19 | Multi-Stage Fracture | 2818.70 | 2819.30 | 0 |
| 2013-03-19 | Multi-Stage Fracture | 2760.60 | 2761.10 | 0 |
| 2013-03-19 | Multi-Stage Fracture | 2702.80 | 2703.40 | 0 |
| 2013-03-19 | Multi-Stage Fracture | 2644.30 | 2644.90 | 0 |
| 2013-03-19 | Multi-Stage Fracture | 2585.70 | 2586.20 | 0 |
| 2013-03-19 | Multi-Stage Fracture | 3602.30 | 3602.70 | 0 |
| 2013-03-19 | Multi-Stage Fracture | 3531.10 | 3531.60 | 0 |
| 2013-03-19 | Multi-Stage Fracture | 3461.10 | 3461.60 | 0 |
| 2013-03-19 | Multi-Stage Fracture | 3402.60 | 3403.10 | 0 |
| 2013-03-19 | Multi-Stage Fracture | 3344.80 | 3345.30 | 0 |
| 2013-03-19 | Multi-Stage Fracture | 3287.00 | 3287.60 | 0 |
| 2013-03-19 | Multi-Stage Fracture | 3228.90 | 3229.40 | 0 |
| 2013-03-19 | Multi-Stage Fracture | 3170.50 | 3171.00 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2013-03-19 | 2013-03-19 | 2,327 | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | No specific ingredients | Not Available | 100 | 75.4193 | N/A | |||
| Sand (30/50) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 9.7408 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 9.7408 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 9.7408 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 9.7411 | N/A | ||||
| Sand (40/70) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 8.2977 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 8.2977 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 8.2978 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 8.2977 | N/A | ||||
| Tolcide PS75LT | Canyon | Bactericide/Biocide | Non-hazardous base ingredient(s) | Not Available | 100 | 0.0125 | N/A | |
| Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0125 | N/A | ||||
| CAN-1911 Clay Stabilizer | Canyon | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.072 | N/A | |
| Non-hazardous base ingredient(s) | Not Available | 100 | 0.072 | N/A | ||||
| Nitrogen Gas | Canyon | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 6.299 | N/A | |
| Non-hazardous base ingredient(s) | Not Available | 100 | 6.299 | N/A | ||||
| CAN-2057 Friction Reducer | Canyon | Friction Reducer | No hazardous ingredients | Not Available | 100 | 0.0841 | N/A | |
| CAN-2410 Demulsifier | Canyon | Surfactant | Methyl Alcohol | 67-56-1 | 100 | 0.0741 | N/A | |
| Non-hazardous base ingredient(s) | Not Available | 100 | 0.0741 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2013-03-18 | 2013-03-18 | Surface Water - Runoff | 2000 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2013 | 5855 | 0.0 | 0.0 | 0.0 |
| 2014 | 7617 | 0.0 | 0.0 | 0.0 |
| 2015 | 7077 | 0.0 | 0.0 | 0.0 |
| 2016 | 8130 | 0.0 | 0.0 | 0.0 |
| 2017 | 8226 | 0.0 | 0.0 | 0.0 |
| 2018 | 6819 | 0.0 | 0.0 | 0.0 |
| 2019 | 7236 | 0.0 | 0.0 | 0.0 |
| 2020 | 1809 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-02-20 | No Incident Encountered | 0.00 | 0.00 |
| 2013-04-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]