X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385102409002

Well Details

Well ID: 0385102409002
Loading map...
Location: 00/09-24-038-10W5/2
Location Alias: 00/09-24-38-10 W5M
Location Alias 2: 00/09-24-038-10 W5/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 10
Section: 24
County/Municipality: Clearwater County
Well Name: NAL FERRIER 9-24-38-10
Operator Name: NAL Resources Limited
License Number: 0089821
License Date: 1981-04-21
License Status: Issued
Spud Date: 1985-09-18
Final Drill Date: 1985-09-19
Well Total Depth: 4526.00 m
Surface Hole Latitude: 52.285475
Surface Hole Longitude: -115.293899

For data sources see[1][2]

Well History

Date Event
1981-04-21 Obtained License
1985-09-19 Finished Drilling
1985-09-26 Perforation Treatment Performed - Jet Perforation
1985-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-09-27 Perforation Treatment Performed - Cement Squeeze
1985-10-01 Perforation Treatment Performed - Jet Perforation
1985-10-02 Perforation Treatment Performed - Jet Perforation
1985-11-09 Rig Released
1986-01-10 Perforation Treatment Performed - Fractured
1986-02-01 Well Mode changed to Drilled and Cased
1994-09-14 Well Began Production
1994-09-14 Well Fluid changed to Gas
1994-09-14 Well Mode changed to Flowing
2009-11-18 Well Fluid changed to Gas
2009-11-18 Well Mode changed to Pumping
2019-09-01 Well Fluid changed to Gas
2019-09-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-09-26 Perforation 2792.00 2792.50 13
1985-09-26 Perforation 2680.00 2680.50 13
1985-09-27 Acid Treatment 2680.00 2792.50 0
1985-09-27 Cement Squeeze 2680.00 2792.50 0
1985-10-01 Perforation 2780.00 2784.00 13
1985-10-02 Perforation 2780.00 2784.00 13
1986-01-10 Fracture 2780.00 2784.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 162 0.0 0.0 0.0
1986 193 0.0 0.0 0.0
1994 1817 0.0 0.0 0.0
1995 8322 0.0 0.0 0.0
1996 8276 0.0 0.0 0.0
1997 8227 0.0 0.0 0.0
1998 7908 0.0 0.0 0.0
1999 8203 0.0 0.0 0.0
2000 7979 0.0 0.0 0.0
2001 8328 0.0 0.0 0.0
2002 8262 0.0 0.0 0.0
2003 8480 0.0 0.0 0.0
2004 8368 0.0 0.0 0.0
2005 7501 0.0 0.0 0.0
2006 7903 0.0 0.0 0.0
2007 6474 0.0 0.0 0.0
2008 7824 0.0 0.0 0.0
2009 8421 0.0 0.0 0.0
2010 7586 0.0 0.0 0.0
2011 8735 0.0 0.0 0.0
2012 8711 0.0 0.0 0.0
2013 8581 0.0 0.0 0.0
2014 7635 0.0 0.0 0.0
2015 8627 0.0 0.0 0.0
2016 8031 0.0 0.0 0.0
2017 8370 0.0 0.0 0.0
2018 3515 0.0 0.0 0.0
2019 24 0.0 0.0 0.0

For data sources see[5]

References