X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394031302000

Well Details

Well ID: 0394031302000
Loading map...
Location: 00/02-13-039-03W4/0
Location Alias: 00/02-13-39-03 W4M
Location Alias 2: 00/02-13-039-03 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 03
Section: 13
County/Municipality: Municipal District of Provost No. 52
Well Name: CABRE PROVOST 2-13-39-3
Operator Name: Enerplus Corporation
License Number: 0153561
License Date: 1992-08-27
License Status: Issued
Spud Date: 1992-08-31
Final Drill Date: 1992-09-02
Well Total Depth: 840.00 m
Surface Hole Latitude: 52.347269
Surface Hole Longitude: -110.302073

For data sources see[1][2]

Well History

Date Event
1992-08-27 Obtained License
1992-08-31 Surface Casing Operation Performed
1992-09-02 Finished Drilling
1992-09-02 Well Log Performed
1992-09-02 Well Mode changed to Drilled and Cased
1992-09-03 Production Casing Operation Performed
1992-09-03 Rig Released
1992-09-15 Perforation Treatment Performed - Jet Perforation
1992-09-16 Perforation Treatment Performed - Jet Perforation
1992-09-17 Perforation Treatment Performed - Fractured
1992-10-01 Well Began Production
1992-10-01 Well Fluid changed to Crude Oil
1992-10-01 Well Mode changed to Pumping
1994-10-31 Well Fluid changed to Crude Oil
1994-10-31 Well Mode changed to Suspended
1995-05-24 Well Fluid changed to Crude Oil
1995-05-24 Well Mode changed to Pumping
2003-08-07 Perforation Treatment Performed - Fractured
2009-03-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-27 Plug Back Performed
2009-03-27 Well Fluid changed to Crude Oil
2009-03-27 Well Log Performed
2009-03-27 Well Mode changed to Abandoned Zone
2009-03-28 Perforation Treatment Performed - Jet Perforation
2009-03-29 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-09-15 Perforation 769.00 771.00 13
1992-09-16 Perforation 773.00 777.00 13
1992-09-17 Fracture 769.00 777.00 0
2003-08-07 Fracture 769.00 777.00 0
2009-03-27 Packing Device Capped w/Cement 756.00 764.00 0
2009-03-28 Perforation 735.50 738.00 20
2009-03-29 Fracture 735.50 738.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 1879 0.0 0.0 0.0
1993 5888 0.0 0.0 0.0
1994 3408 0.0 0.0 0.0
1995 4602 0.0 0.0 0.0
1996 6071 0.0 0.0 0.0
1997 8230 0.0 0.0 0.0
1998 8679 0.0 0.0 0.0
1999 8718 0.0 0.0 0.0
2000 8721 0.0 0.0 0.0
2001 8638 0.0 0.0 0.0
2002 8247 0.0 0.0 0.0
2003 7625 0.0 0.0 0.0
2004 8486 0.0 0.0 0.0
2005 8735 0.0 0.0 0.0
2006 8716 0.0 0.0 0.0
2007 8709 0.0 0.0 0.0
2008 8756 0.0 0.0 0.0
2009 2002 0.0 0.0 0.0

For data sources see[5]

References