X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394031302002

Well Details

Well ID: 0394031302002
Loading map...
Location: 00/02-13-039-03W4/2
Location Alias: 00/02-13-39-03 W4M
Location Alias 2: 00/02-13-039-03 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 03
Section: 13
County/Municipality: Municipal District of Provost No. 52
Well Name: CABRE PROVOST 2-13-39-3
Operator Name: Enerplus Corporation
License Number: 0153561
License Date: 1992-08-27
License Status: Issued
Spud Date: 1992-08-31
Final Drill Date: 1992-09-02
Well Total Depth: 840.00 m
Surface Hole Latitude: 52.347269
Surface Hole Longitude: -110.302073

For data sources see[1][2]

Well History

Date Event
1992-08-27 Obtained License
1992-08-31 Surface Casing Operation Performed
1992-09-02 Finished Drilling
1992-09-02 Well Log Performed
1992-09-02 Well Mode changed to Drilled and Cased
1992-09-03 Production Casing Operation Performed
1992-09-03 Rig Released
1992-09-15 Perforation Treatment Performed - Jet Perforation
1992-09-16 Perforation Treatment Performed - Jet Perforation
1992-09-17 Perforation Treatment Performed - Fractured
2003-08-07 Perforation Treatment Performed - Fractured
2009-03-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-27 Plug Back Performed
2009-03-27 Well Log Performed
2009-03-28 Perforation Treatment Performed - Jet Perforation
2009-03-29 Perforation Treatment Performed - Fractured
2009-04-18 Well Began Production
2009-04-18 Well Fluid changed to Crude Oil
2009-04-18 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-09-15 Perforation 769.00 771.00 13
1992-09-16 Perforation 773.00 777.00 13
1992-09-17 Fracture 769.00 777.00 0
2003-08-07 Fracture 769.00 777.00 0
2009-03-27 Packing Device Capped w/Cement 756.00 764.00 0
2009-03-28 Perforation 735.50 738.00 20
2009-03-29 Fracture 735.50 738.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 5895 0.0 0.0 0.0
2010 8543 0.0 0.0 0.0
2011 8704 0.0 0.0 0.0
2012 8758 0.0 0.0 0.0
2013 8348 0.0 0.0 0.0
2014 8610 0.0 0.0 0.0
2015 8572 0.0 0.0 0.0
2016 8688 0.0 0.0 0.0
2017 8651 0.0 0.0 0.0
2018 8577 0.0 0.0 0.0
2019 8526 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References