X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394031309002

Well Details

Well ID: 0394031309002
Loading map...
Location: 00/09-13-039-03W4/2
Location Alias: 00/09-13-39-03 W4M
Location Alias 2: 00/09-13-039-03 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 03
Section: 13
County/Municipality: Municipal District of Provost No. 52
Well Name: CABRE PROVOST 9-13-39-3
Operator Name: Enerplus Corporation
License Number: 0191013
License Date: 1996-09-04
License Status: Issued
Spud Date: 1996-09-14
Final Drill Date: 1996-09-15
Well Total Depth: 825.00 m
Surface Hole Latitude: 52.355547
Surface Hole Longitude: -110.296551

For data sources see[1][2]

Well History

Date Event
1996-09-04 Obtained License
1996-09-14 Surface Casing Operation Performed
1996-09-15 Finished Drilling
1996-09-15 Well Mode changed to Drilled and Cased
1996-09-16 Production Casing Operation Performed
1996-09-16 Rig Released
1996-09-16 Well Log Performed
1996-11-06 Well Log Performed
1996-11-07 Perforation Treatment Performed - Jet Perforation
2004-08-14 Well Began Production
2004-08-14 Well Fluid changed to Crude Oil
2004-08-14 Well Mode changed to Pumping
2004-08-18 Perforation Treatment Performed - Jet Perforation
2009-06-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-06-04 Perforation Treatment Performed - Jet Perforation
2009-06-04 Plug Back Performed
2009-06-04 Well Fluid changed to Crude Oil
2009-06-04 Well Log Performed
2009-06-04 Well Mode changed to Abandoned Zone
2009-06-08 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-11-07 Perforation 790.40 791.50 13
1996-11-07 Perforation 792.60 793.50 13
2004-08-18 Perforation 780.00 782.00 17
2004-08-18 Perforation 784.00 786.00 17
2009-06-04 Packing Device Capped w/Cement 772.00 775.00 0
2009-06-04 Perforation 739.00 741.00 20
2009-06-08 Fracture 739.00 741.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 3125 0.0 0.0 0.0
2005 8508 0.0 0.0 0.0
2006 8726 0.0 0.0 0.0
2007 8534 0.0 0.0 0.0
2008 8718 0.0 0.0 0.0
2009 3539 0.0 0.0 0.0

For data sources see[5]

References