X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394031401003

Well Details

Well ID: 0394031401003
Loading map...
Location: 00/01-14-039-03W4/3
Location Alias: 00/01-14-39-03 W4M
Location Alias 2: 00/01-14-039-03 W4/03
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 03
Section: 14
County/Municipality: Municipal District of Provost No. 52
Well Name: CABRE COHO PROVOST 1-14-39-3
Operator Name: Enerplus Corporation
License Number: 0135823
License Date: 1988-08-25
License Status: Issued
Spud Date: 1988-09-05
Final Drill Date: 1988-09-08
Well Total Depth: 865.00 m
Surface Hole Latitude: 52.350177
Surface Hole Longitude: -110.323730

For data sources see[1][2]

Well History

Date Event
1988-08-25 Obtained License
1988-09-05 Surface Casing Operation Performed
1988-09-06 Direction Drilling Operation Performed - Deviate
1988-09-08 Finished Drilling
1988-09-08 Well Log Performed
1988-09-08 Well Mode changed to Drilled and Cased
1988-09-09 Well Log Performed
1988-09-10 Production Casing Operation Performed
1988-09-10 Rig Released
1988-09-12 Well Log Performed
1988-09-15 Well Log Performed
1988-09-27 Perforation Treatment Performed - Jet Perforation
1988-09-27 Well Log Performed
1988-09-28 Perforation Treatment Performed - Jet Perforation
1994-01-09 Well Log Performed
1994-01-11 Perforation Treatment Performed - Jet Perforation
1994-04-27 Perforation Treatment Performed - Fractured
1995-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-03-08 Plug Back Performed
1995-03-08 Well Log Performed
2009-06-05 Well Log Performed
2009-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-06-06 Perforation Treatment Performed - Jet Perforation
2009-06-06 Plug Back Performed
2009-06-06 Well Log Performed
2009-06-07 Perforation Treatment Performed - Fractured
2009-06-09 Perforation Treatment Performed - Fractured
2009-06-26 Well Began Production
2009-06-26 Well Fluid changed to Crude Oil
2009-06-26 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-09-06 189.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-09-27 Perforation 798.00 800.00 13
1988-09-28 Perforation 801.00 803.00 13
1994-01-11 Perforation 812.00 813.00 13
1994-04-27 Fracture 812.00 813.00 0
1995-03-08 Packing Device Capped w/Cement 808.50 810.00 0
2009-06-06 Packing Device Capped w/Cement 791.00 795.00 0
2009-06-06 Perforation 767.50 769.50 20
2009-06-07 Fracture 767.50 769.50 0
2009-06-09 Fracture 767.50 769.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 4395 0.0 0.0 0.0
2010 8548 0.0 0.0 0.0
2011 8586 0.0 0.0 0.0
2012 8778 0.0 0.0 0.0
2013 8705 0.0 0.0 0.0
2014 7751 0.0 0.0 0.0
2015 8585 0.0 0.0 0.0
2016 8708 0.0 0.0 0.0
2017 8339 0.0 0.0 0.0
2018 8589 0.0 0.0 0.0
2019 8637 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References