If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394031411032 | |
Location: 03/11-14-039-03W4/2 | |
Location Alias: 03/11-14-39-03 W4M | |
Location Alias 2: 03/11-14-039-03 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 03 | |
Section: 14 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: CABRE 11A PROVOST 11-14-39-3 | |
Operator Name: Enerplus Corporation | |
License Number: 0165521 | |
License Date: 1994-03-01 | |
License Status: Issued | |
Spud Date: 1994-07-12 | |
Final Drill Date: 1994-07-15 | |
Well Total Depth: 837.00 m | |
Surface Hole Latitude: 52.355308 | |
Surface Hole Longitude: -110.330387 |
Date | Event |
---|---|
1994-03-01 | Obtained License |
1994-04-25 | Well Log Performed |
1994-07-13 | Surface Casing Operation Performed |
1994-07-15 | Finished Drilling |
1994-07-15 | Well Log Performed |
1994-07-15 | Well Mode changed to Drilled and Cased |
1994-07-16 | Production Casing Operation Performed |
1994-07-16 | Rig Released |
1994-07-19 | Well Log Performed |
1994-07-27 | Perforation Treatment Performed - Jet Perforation |
1994-07-27 | Well Log Performed |
1994-07-28 | Perforation Treatment Performed - Fractured |
1994-11-17 | Perforation Treatment Performed - Cement Squeeze |
1994-11-17 | Plug Back Performed |
1994-11-24 | Perforation Treatment Performed - Jet Perforation |
1994-11-24 | Well Log Performed |
1994-11-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-11-25 | Well Log Performed |
1995-01-27 | Well Began Injection |
1995-01-27 | Well Fluid changed to Water |
1995-01-27 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-07-27 | Perforation | 744.00 | 746.00 | 13 |
1994-07-28 | Fracture | 744.00 | 746.00 | 0 |
1994-11-17 | Cement Squeeze | 744.00 | 746.00 | 0 |
1994-11-24 | Perforation | 777.50 | 779.50 | 13 |
1994-11-24 | Perforation | 780.00 | 782.00 | 13 |
1994-11-24 | Perforation | 783.00 | 784.00 | 13 |
1994-11-25 | Acid Treatment | 777.50 | 784.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
1997 | 0 | 0.0 | 0.0 | 0.0 |
1998 | 0 | 0.0 | 0.0 | 0.0 |
1999 | 0 | 0.0 | 0.0 | 0.0 |
2000 | 0 | 0.0 | 0.0 | 0.0 |
2001 | 0 | 0.0 | 0.0 | 0.0 |
2002 | 0 | 0.0 | 0.0 | 0.0 |
2003 | 0 | 0.0 | 0.0 | 0.0 |
2004 | 0 | 0.0 | 0.0 | 0.0 |
2005 | 0 | 0.0 | 0.0 | 0.0 |
2006 | 0 | 0.0 | 0.0 | 0.0 |
2007 | 0 | 0.0 | 0.0 | 0.0 |
2008 | 0 | 0.0 | 0.0 | 0.0 |
2009 | 0 | 0.0 | 0.0 | 0.0 |
2010 | 0 | 0.0 | 0.0 | 0.0 |
2011 | 0 | 0.0 | 0.0 | 0.0 |
2012 | 0 | 0.0 | 0.0 | 0.0 |
2013 | 0 | 0.0 | 0.0 | 0.0 |
2014 | 0 | 0.0 | 0.0 | 0.0 |
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
2017 | 0 | 0.0 | 0.0 | 0.0 |
2018 | 0 | 0.0 | 0.0 | 0.0 |
2019 | 0 | 0.0 | 0.0 | 0.0 |
2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]