X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394031414002

Well Details

Well ID: 0394031414002
Loading map...
Location: 00/14-14-039-03W4/2
Location Alias: 00/14-14-39-03 W4M
Location Alias 2: 00/14-14-039-03 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 03
Section: 14
County/Municipality: Municipal District of Provost No. 52
Well Name: CABRE COHO PROVOST 14-14-39-3
Operator Name: Enerplus Corporation
License Number: 0134415
License Date: 1988-06-17
License Status: Abandoned
Spud Date: 1988-06-25
Final Drill Date: 1988-06-27
Well Total Depth: 865.00 m
Surface Hole Latitude: 52.360651
Surface Hole Longitude: -110.334346

For data sources see[1][2]

Well History

Date Event
1988-06-17 Obtained License
1988-06-25 Surface Casing Operation Performed
1988-06-27 Finished Drilling
1988-06-27 Well Log Performed
1988-06-27 Well Mode changed to Drilled and Cased
1988-06-28 Production Casing Operation Performed
1988-06-28 Rig Released
1988-07-09 Well Log Performed
1988-07-11 Perforation Treatment Performed - Jet Perforation
1988-07-11 Well Log Performed
1989-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-02-13 Plug Back Performed
1989-02-13 Well Log Performed
1989-02-14 Perforation Treatment Performed - Jet Perforation
1989-02-14 Well Began Production
1989-02-14 Well Fluid changed to Crude Oil
1989-02-14 Well Mode changed to Pumping
1989-02-15 Perforation Treatment Performed - Fractured
1989-02-16 Well Log Performed
1990-12-10 Well Fluid changed to Crude Oil
1990-12-10 Well Mode changed to Suspended
1994-05-05 Perforation Treatment Performed - Cement Squeeze
1994-05-05 Plug Back Performed
1994-05-05 Well Fluid changed to Crude Oil
1994-05-05 Well Mode changed to Abandoned Zone
1994-05-07 Perforation Treatment Performed - Jet Perforation
1994-05-08 Perforation Treatment Performed - Cement Squeeze
1994-05-11 Perforation Treatment Performed - Jet Perforation
1994-05-11 Well Log Performed
1997-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-11-07 Perforation Treatment Performed - Jet Perforation
1997-11-07 Plug Back Performed
1997-11-07 Well Log Performed
2014-01-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-01-12 Well Log Performed
2014-01-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-01-22 Perforation Treatment Performed - Cement Squeeze
2014-01-22 Plug Back Performed
2014-03-07 Perforation Treatment Performed - Jet Perforation
2014-03-07 Well Log Performed
2014-03-11 Perforation Treatment Performed - Remedial Casing
2014-03-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-07-11 Perforation 806.00 808.00 13
1997-11-07 Packing Device Capped w/Cement 814.00 822.00 0
1997-11-07 Perforation 216.00 221.00 17
2014-01-12 Packing Device Capped w/Cement 786.90 794.90 0
2014-01-13 Packing Device Capped w/Cement 736.90 744.90 0
2014-01-22 Cement Squeeze 216.00 221.00 0
2014-03-07 Perforation 267.00 268.00 20
2014-03-07 Perforation 181.50 183.50 20
2014-03-11 Remedial Casing Cementing 181.50 268.00 0
1989-02-13 Packing Device Capped w/Cement 794.00 802.00 0
1989-02-14 Perforation 750.60 754.00 13
1989-02-15 Fracture 750.60 754.00 0
1994-05-05 Cement Squeeze 750.60 754.00 0
1994-05-07 Perforation 806.00 808.00 13
1994-05-08 Cement Squeeze 806.00 808.00 0
1994-05-11 Perforation 827.00 833.00 13
1994-05-11 Perforation 840.00 844.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 2113 0.0 0.0 0.0
1990 2180 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-03-19 No Incident Encountered 0.00 0.00

For data sources see[6]

References