If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0394041208080 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.329646,"lon":-110.44034,"icon":""}]} |
| Location: 08/08-12-039-04W4/0 | |
| Location Alias: 08/08-12-39-04 W4M | |
| Location Alias 2: 08/08-12-039-04 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 039 | |
| Meridian: 4 | |
| Range: 04 | |
| Section: 12 | |
| County/Municipality: Municipal District of Provost No. 52 | |
| Well Name: BOW RIVER PROVOST 8-12-39-4 | |
| Operator Name: Bow River Energy Ltd. | |
| License Number: 0428699 | |
| License Date: 2010-12-22 | |
| License Status: Suspension | |
| Spud Date: 2011-01-14 | |
| Final Drill Date: 2011-01-21 | |
| Well Total Depth: 1541.00 m | |
| Surface Hole Latitude: 52.329646 | |
| Surface Hole Longitude: -110.440340 |
| Date | Event |
|---|---|
| 2010-12-22 | Obtained License |
| 2011-01-14 | Surface Casing Operation Performed |
| 2011-01-15 | Direction Drilling Operation Performed - Deviate |
| 2011-01-16 | Well Log Performed |
| 2011-01-17 | Direction Drilling Operation Performed - Horizontal |
| 2011-01-19 | Intermediate Casing Operation Performed |
| 2011-01-21 | Finished Drilling |
| 2011-01-21 | Well Mode changed to Drilled and Cased |
| 2011-01-22 | Liner Casing Operation Performed |
| 2011-01-22 | Perforation Treatment Performed - Slotted Liner or Casing |
| 2011-01-23 | Rig Released |
| 2011-02-04 | Well Log Performed |
| 2011-03-05 | Well Began Production |
| 2011-03-05 | Well Fluid changed to Crude Oil |
| 2011-03-05 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-01-15 | 169.00 | Deviate (5 - 79 degrees) |
| 2011-01-17 | 903.50 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-01-22 | Slotted Liner | 1075.00 | 1541.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 6968 | 0.0 | 0.0 | 0.0 |
| 2012 | 7749 | 0.0 | 0.0 | 0.0 |
| 2013 | 8579 | 0.0 | 0.0 | 0.0 |
| 2014 | 8057 | 0.0 | 0.0 | 0.0 |
| 2015 | 8722 | 0.0 | 0.0 | 0.0 |
| 2016 | 3984 | 0.0 | 0.0 | 0.0 |
For data sources see[6]