X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394081201000

Well Details

Well ID: 0394081201000
Loading map...
Location: 00/01-12-039-08W4/0
Location Alias: 00/01-12-39-08 W4M
Location Alias 2: 00/01-12-039-08 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 08
Section: 12
County/Municipality: Municipal District of Provost No. 52
Well Name: CLEO ENERGY PROVOST 1-12-39-8
Operator Name: Cleo Energy Corp.
License Number: 0186048
License Date: 1996-02-21
License Status: Abandoned
Spud Date: 1996-07-07
Final Drill Date: 1996-07-09
Well Total Depth: 965.00 m
Surface Hole Latitude: 52.332925
Surface Hole Longitude: -111.017417

For data sources see[1][2]

Well History

Date Event
1996-02-21 Obtained License
1996-07-07 Well Log Performed
1996-07-08 Lost Circulation Occurred
1996-07-08 Surface Casing Operation Performed
1996-07-09 Finished Drilling
1996-07-09 Well Mode changed to Drilled and Cased
1996-07-10 Production Casing Operation Performed
1996-07-10 Well Log Performed
1996-07-11 Rig Released
1996-07-15 Well Log Performed
1996-07-16 Perforation Treatment Performed - Jet Perforation
1996-07-16 Well Log Performed
1996-07-21 Perforation Treatment Performed - Fractured
1996-07-31 Well Log Performed
1996-08-09 Well Began Production
1996-08-09 Well Fluid changed to Crude Oil
1996-08-09 Well Mode changed to Pumping
1997-02-28 Perforation Treatment Performed - Jet Perforation
1997-02-28 Well Log Performed
1997-03-01 Well Fluid changed to Crude Oil
1997-03-01 Well Mode changed to Suspended
1997-04-17 Well Began Injection
1997-04-17 Well Fluid changed to Water
1997-04-17 Well Type changed to Injection
2000-06-30 Perforation Treatment Performed - Cement Squeeze
2000-06-30 Well Log Performed
2000-07-05 Perforation Treatment Performed - Jet Perforation
2000-07-06 Well Log Performed
2003-02-19 Perforation Treatment Performed - Jet Perforation
2003-02-21 Perforation Treatment Performed - Jet Perforation
2005-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-04 Perforation Treatment Performed - Cement Plug
2010-03-04 Plug Back Performed
2010-03-04 Well Fluid changed to Water
2010-03-04 Well Mode changed to Abandoned Zone
2010-03-04 Well Type changed to Injection
2010-04-08 Perforation Treatment Performed - Cement Plug
2010-05-26 Well Abandoned
2010-05-26 Well Fluid changed to Water
2010-05-26 Well Mode changed to Abandoned
2010-05-26 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-07-16 Perforation 892.00 894.00 13
2010-02-21 Packing Device Capped w/Cement 28.00 889.00 0
2010-03-04 Cement Plug 0.00 30.00 0
2010-04-08 Cement Plug 3.80 15.00 0
1996-07-16 Perforation 902.00 904.00 13
1996-07-21 Fracture 892.00 904.00 0
1997-02-28 Perforation 906.00 907.00 18
2000-06-30 Cement Squeeze 892.00 907.00 0
2000-07-05 Perforation 904.00 907.00 20
2003-02-19 Perforation 904.00 907.00 17
2003-02-21 Perforation 910.00 912.00 17
2005-12-05 Acid Treatment 904.00 912.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 3162 0.0 0.0 0.0
1997 816 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1996-07-08 Lost Circulation 128.00 159.00

For data sources see[6]

References