X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394082106000

Well Details

Well ID: 0394082106000
Loading map...
Location: 00/06-21-039-08W4/0
Location Alias: 00/06-21-39-08 W4M
Location Alias 2: 00/06-21-039-08 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 08
Section: 21
County/Municipality: Municipal District of Provost No. 52
Well Name: ACL PROVOST 6-21-39-8
Operator Name: Karve Energy Inc.
License Number: 0017997
License Date: 1959-10-22
License Status: RecCertified
Spud Date: 1959-12-09
Final Drill Date: 1959-12-17
Well Total Depth: 972.30 m
Surface Hole Latitude: 52.366636
Surface Hole Longitude: -111.100256

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-10-22 Obtained License
1959-12-15 Drill Stem Test Performed
1959-12-16 Drill Stem Test Performed
1959-12-17 Finished Drilling
1959-12-17 Well Mode changed to Drilled and Cased
1959-12-19 Production Casing Operation Performed
1959-12-20 Perforation Treatment Performed - Jet Perforation
1960-01-06 Perforation Treatment Performed - Fractured
1961-01-12 Well Fluid changed to Gas
1961-01-12 Well Mode changed to Testing
2000-06-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-06-26 Plug Back Performed
2000-06-26 Well Fluid changed to Gas
2000-06-26 Well Mode changed to Abandoned Zone
2000-06-27 Perforation Treatment Performed - Jet Perforation
2000-06-27 Well Log Performed
2000-06-28 Perforation Treatment Performed - Remedial Casing
2000-07-06 Well Abandoned
2000-07-06 Well Fluid changed to Gas
2000-07-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-12-20 Perforation 779.40 779.70 13
1959-12-20 Perforation 776.30 777.20 13
1960-01-06 Fracture 776.30 779.70 0
2000-06-26 Packing Device Capped w/Cement 758.00 766.00 0
2000-06-27 Perforation 312.00 313.00 20
2000-06-28 Remedial Casing Cementing 312.00 313.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References